Artisan Electric
Washington's largest residential solar installer with licensed union electricians and Tesla Solar Roof certification
19+
Years in Business
34
Customer Reviews
62 mi
Service Area
51-100
Employees
SurgePV Score
About Artisan Electric
Artisan Electric is the largest residential and commercial solar installer in Washington State, headquartered at 969 S Nebraska St, Suite A, Seattle, WA 98108, with service coverage throughout the Puget Sound region including Tacoma. Founded in 2007, the company employs licensed union electricians and holds certifications as Washington’s first Tesla Solar Roof installer and Tesla Powerwall installer.
Artisan Electric provides solar panel installation, Tesla Solar Roof installation, battery backup systems, EV charger installation, and general electrical services. The company serves both residential and commercial customers and has built a reputation for high-quality craftsmanship backed by union labor standards.
Artisan Electric operates Monday through Friday, 8:00 AM to 5:00 PM, and holds a 4.6-star rating on Yelp from 34 reviews. The company offers free consultations for solar projects across the greater Seattle and Tacoma metro areas.
Service Area
Artisan Electric serves the following areas within a 62-mile radius:
Contact Information
Are you Artisan Electric?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.6
34 reviews
Verified Customer
Artisan Electric is the real deal. As the largest residential solar installer in Washington, they have the experience and resources to handle any project. Our installation was flawless.
Verified Customer
We chose Artisan Electric for their Tesla Solar Roof expertise. The union electricians did outstanding work and the system looks amazing. Worth every penny.
Verified Customer
Professional installation by skilled electricians. The Tesla Powerwall integration was seamless and we now have backup power during outages. Good communication throughout the project.
Frequently Asked Questions About Artisan Electric
What services does Artisan Electric offer?
Artisan Electric offers Solar Installation, Battery Storage, EV Charging, Maintenance.
Is Artisan Electric NABCEP certified?
Artisan Electric holds the following certifications: Tesla Solar Roof Certified, Tesla Powerwall Certified, Union Labor. Contact them directly for the latest accreditation details.
What areas does Artisan Electric serve?
Artisan Electric serves Tacoma, Seattle, Bellevue, Olympia, Everett. They are based in Tacoma with a service radius of 100 km.
What warranty does Artisan Electric offer?
Artisan Electric offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Artisan Electric's customer reviews?
Artisan Electric has a 4.6/5 rating based on 34 customer reviews. Customers consistently rate them highly.
How long has Artisan Electric been in business?
Artisan Electric was founded in 2007 and has been in business for 19 years. They are one of the more experienced solar installers in their area.
Similar Installers in Tacoma
Get a Free Solar Quote from Artisan Electric
Fill in your details and we'll connect you with Artisan Electric.
Quote request sent!
Artisan Electric will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile