AS

ATX Solar

Austin-based solar and battery storage installer delivering clear pricing and personalized energy solutions

Austin, Texas
4.9 (45 reviews)
Verified
Residential

7+

Years in Business

0

45

Customer Reviews

50 mi

Service Area

1-10

Employees

SurgePV Score

7.6 / 10
Customer Reviews
98%
Certifications
60%
Experience
70%
Services Range
100%
Warranty Coverage
80%
Online Presence
25%

About ATX Solar

ATX Solar is a locally owned solar installation company based in downtown Austin, Texas. The company focuses on residential solar PV and battery storage installations across the Austin metro area, with a reputation for clear pricing, transparent communication, and personalized energy solutions. ATX Solar earned a 4.9 out of 5.0 rating on EcoWatch, ranking it among the top local installers in the city.

The company provides full-service solar installations including system design, permitting, installation, utility interconnection, and post-install monitoring. ATX Solar installs panels from Qcells, REC, and Silfab alongside Enphase microinverters and SolarEdge optimizers. Battery storage options include the Tesla Powerwall and Enphase IQ Battery, giving homeowners backup power capability during grid outages, which is particularly valuable given Texas grid reliability concerns.

ATX Solar’s approach centers on education and transparency. The company provides detailed consultations that help homeowners understand their energy usage, system sizing options, financing paths, and expected return on investment before committing. Customers consistently highlight the no-pressure sales experience and the company’s willingness to answer questions throughout the process. ATX Solar also offers financing assistance to help homeowners take advantage of the federal Investment Tax Credit and available Austin Energy rebates.

Service Area

ATX Solar serves the following areas within a 50-mile radius:

AustinRound RockCedar ParkPflugervilleGeorgetownLeanderKyleBudaLakeway

Are you ATX Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Energy Audit
Grid Connection
Monitoring

Certifications & Accreditations

NABCEP

Partner Manufacturers

Panels

QcellsRECSilfab

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallEnphase IQ Battery

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.9

45 reviews

Andrew F.

5 August 2025
Verified Customer

ATX Solar was straightforward from the very first call. No high-pressure sales tactics, just honest information about what system size we needed and what it would cost. Installation was quick and clean.

Michelle T.

18 May 2025
Verified Customer

We loved working with ATX Solar. They explained every line item in the quote and helped us understand the financing options. Our system has been performing exactly as promised for six months now.

Carlos R.

30 January 2025
Verified Customer

Great local Austin company. They were responsive to every question and the installation crew was professional. The battery storage addition gives us peace of mind during Texas storms.

Frequently Asked Questions About ATX Solar

What services does ATX Solar offer?

ATX Solar offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Grid Connection, Monitoring.

Is ATX Solar NABCEP certified?

Yes, ATX Solar is NABCEP certified. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does ATX Solar serve?

ATX Solar serves Austin, Round Rock, Cedar Park, Pflugerville, Georgetown, Leander, Kyle, Buda and 1 other areas. They are based in Austin with a service radius of 80 km.

What warranty does ATX Solar offer?

ATX Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are ATX Solar's customer reviews?

ATX Solar has a 4.9/5 rating based on 45 customer reviews. Customers consistently rate them highly.

How long has ATX Solar been in business?

ATX Solar was founded in 2019 and has been in business for 7 years. They have solid experience in the solar industry.

Get a Free Solar Quote from ATX Solar

Fill in your details and we'll connect you with ATX Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote