Aviara Solar Contractors
Family-owned San Diego solar installer since 2007 offering discounted solar panel installations
19+
Years in Business
30
Customer Reviews
50 mi
Service Area
1-10
Employees
SurgePV Score
About Aviara Solar Contractors
Aviara Solar Contractors is a family-owned residential solar installation company serving San Diego County since 2007. With offices at 1939 Friendship Dr, Suite F in El Cajon and 1241 Prospect Street, Suite 4 in La Jolla, the company provides solar panel installation, battery storage, roofing, home energy audits, solar panel cleaning, solar panel repair, and smart home installations.
The company holds a CSLB B general contractor license and works with reputable roofing subcontractors for projects that require both roof work and solar installation. Aviara Solar positions itself as a discount solar installer, aiming to provide competitive pricing without compromising installation quality. The company handles system design, financing guidance, permitting, and installation in-house.
Aviara Solar serves communities throughout San Diego County including El Cajon, La Jolla, Carlsbad, Encinitas, Del Mar, Escondido, and Rancho Santa Fe. The company can be reached by phone at (858) 459-9020 or by email at [email protected].
Service Area
Aviara Solar Contractors serves the following areas within a 50-mile radius:
Contact Information
Are you Aviara Solar Contractors?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.5
30 reviews
Amanda L.
Aviara Solar provided a great price and quality installation. The team was professional and completed the job on time. Very happy with our system.
John D.
We chose Aviara for their competitive pricing and local reputation. The installation went smoothly and our energy bills have dropped significantly.
Rachel P.
Good experience overall. Pricing was fair and the installation quality is solid. Would recommend to friends and family.
Frequently Asked Questions About Aviara Solar Contractors
What services does Aviara Solar Contractors offer?
Aviara Solar Contractors offers Solar Installation, Battery Storage, Maintenance, Energy Audit, roofing.
Is Aviara Solar Contractors NABCEP certified?
Aviara Solar Contractors holds the following certifications: CSLB Licensed. Contact them directly for the latest accreditation details.
What areas does Aviara Solar Contractors serve?
Aviara Solar Contractors serves San Diego, El Cajon, La Jolla, Carlsbad, Encinitas, Del Mar, Escondido, Rancho Santa Fe. They are based in San Diego with a service radius of 80 km.
What warranty does Aviara Solar Contractors offer?
Aviara Solar Contractors offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Aviara Solar Contractors's customer reviews?
Aviara Solar Contractors has a 4.5/5 rating based on 30 customer reviews. Customers consistently rate them highly.
How long has Aviara Solar Contractors been in business?
Aviara Solar Contractors was founded in 2007 and has been in business for 19 years. They are one of the more experienced solar installers in their area.
Similar Installers in San Diego
Get a Free Solar Quote from Aviara Solar Contractors
Fill in your details and we'll connect you with Aviara Solar Contractors.
Quote request sent!
Aviara Solar Contractors will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile