AS

AWS Solar

NABCEP-certified Los Angeles solar contractor specializing in solar, battery storage, and EV charging since 2007

Los Angeles, California
4.6 (52 reviews)
Verified
Residential Commercial

19+

Years in Business

0

52

Customer Reviews

50 mi

Service Area

11-50

Employees

SurgePV Score

9.3 / 10
Customer Reviews
92%
Certifications
100%
Experience
100%
Services Range
100%
Warranty Coverage
100%
Online Presence
50%

About AWS Solar

AWS Solar is a licensed solar and electrical contractor that has served the Los Angeles area since 2007, operating from 11750 Roscoe Boulevard in Sun Valley. The company holds an extensive list of certifications including NABCEP PV Installation Professional, Tesla Certified Installer, Panasonic Certified Installer, SolarEdge Diamond Dealer, Enphase Certified Installer, and Tile Roofing Institute Certified Installer. AWS Solar maintains an A+ rating with the Better Business Bureau, where they have been accredited since October 2007.

The company designs and installs solar panel systems, battery storage units, EV chargers, and electrical upgrades for both residential and commercial properties. AWS Solar works with tier-1 equipment from CertainTeed and Panasonic for panels, Enphase and SolarEdge for inverters, and Tesla Powerwall and FranklinWH for battery storage. Every project is managed in-house from initial design through final commissioning.

AWS Solar has earned 52 reviews on Yelp with an average rating of 4.6 stars. Customers consistently note the company’s professionalism, technical expertise on tile and composite roofs, and transparent pricing. All systems are backed by 25-year warranties on panels, inverters, and installation workmanship.

Service Area

AWS Solar serves the following areas within a 50-mile radius:

Los AngelesSun ValleyBurbankGlendalePasadenaHollywoodSherman OaksEncinoVan NuysNorth Hollywood

Are you AWS Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Maintenance
Monitoring
Solar Design
Energy Audit
Roof Assessment
Grid Connection

Certifications & Accreditations

NABCEP BBB Accredited Tesla Certified Panasonic Certified SolarEdge Diamond Dealer Enphase Certified Tile Roofing Institute Certified

Partner Manufacturers

Panels

CertainTeedPanasonic

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallFranklinWH

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

25 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.6

52 reviews

James C.

30 August 2025
Verified Customer

AWS Solar installed a 12 kW system with FranklinWH battery on our home in Burbank. The NABCEP-certified crew was meticulous, and the tile roof work was flawless. System is producing exactly as designed.

Patricia N.

17 May 2025
Verified Customer

We went with AWS because of their long track record in LA and their certifications. They handled the LADWP interconnection paperwork and we got PTO in under five weeks. Excellent communication throughout.

Kevin D.

28 January 2025
Verified Customer

Good quality installation and fair pricing. The SolarEdge monitoring system they installed lets us track production in real time. Minor scheduling delay but nothing major.

Frequently Asked Questions About AWS Solar

What services does AWS Solar offer?

AWS Solar offers Solar Installation, Battery Storage, EV Charging, Maintenance, Monitoring, Solar Design, Energy Audit, Roof Assessment, Grid Connection.

Is AWS Solar NABCEP certified?

Yes, AWS Solar is NABCEP certified and also holds BBB Accredited, Tesla Certified, Panasonic Certified, SolarEdge Diamond Dealer, Enphase Certified, Tile Roofing Institute Certified certifications. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does AWS Solar serve?

AWS Solar serves Los Angeles, Sun Valley, Burbank, Glendale, Pasadena, Hollywood, Sherman Oaks, Encino and 2 other areas. They are based in Los Angeles with a service radius of 80 km.

What warranty does AWS Solar offer?

AWS Solar offers 25-year panel warranty, 25-year inverter warranty, and 25-year installation/workmanship warranty.

How are AWS Solar's customer reviews?

AWS Solar has a 4.6/5 rating based on 52 customer reviews. Customers consistently rate them highly.

How long has AWS Solar been in business?

AWS Solar was founded in 2007 and has been in business for 19 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from AWS Solar

Fill in your details and we'll connect you with AWS Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote