BS

B Solar Energy

MCS-certified residential and commercial solar installer with 10+ years across Essex

Colchester, UK
5 (41 reviews)
Verified
Residential Commercial

2026+

Years in Business

0

41

Customer Reviews

60 km

Service Area

1-10

Employees

SurgePV Score

7.9 / 10
Customer Reviews
100%
Certifications
60%
Experience
100%
Services Range
90%
Warranty Coverage
63%
Online Presence
25%

About B Solar Energy

B Solar Energy is an MCS-certified solar panel installer serving Colchester, Chelmsford, Brentwood, Basildon, Southend-on-Sea, and the wider Essex area. With over 10 years of experience in solar PV installation, the company provides residential and commercial solar systems, battery storage, and EV charge point installation.

The company’s MCS certification covers both solar PV and battery storage installations, ensuring all systems are installed to the Microgeneration Certification Scheme quality standards. MCS certification is a prerequisite for customers to register for Smart Export Guarantee (SEG) payments, which allow households to receive income for surplus solar electricity exported to the national grid.

B Solar Energy serves both homeowners and businesses, designing systems that match individual energy profiles and property characteristics. Their fully certified installers carry out commercial solar installations with minimal disruption to business operations. Further information and contact details are available through their website at bsolarenergy.co.uk.

Service Area

B Solar Energy serves the following areas within a 60 km radius:

ColchesterChelmsfordBrentwoodBasildonSouthend-on-Sea

Contact Information

Are you B Solar Energy?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Maintenance

Certifications & Accreditations

MCS

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

No reviews yet.

Frequently Asked Questions About B Solar Energy

What services does B Solar Energy offer?

B Solar Energy offers Solar Installation, Battery Storage, EV Charging, Maintenance.

Is B Solar Energy MCS certified?

Yes, B Solar Energy is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does B Solar Energy serve?

B Solar Energy serves Colchester, Chelmsford, Brentwood, Basildon, Southend-on-Sea. They are based in Colchester with a service radius of 60 km.

What warranty does B Solar Energy offer?

B Solar Energy offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are B Solar Energy's customer reviews?

B Solar Energy has a 5/5 rating based on 41 customer reviews. Customers consistently rate them highly.

How long has B Solar Energy been in business?

B Solar Energy was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from B Solar Energy

Fill in your details and we'll connect you with B Solar Energy.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote