GE

Green Energy Electrical

MCS, NICEIC and HIES certified solar PV specialists serving Colchester and Essex

Colchester, UK
5 (103 reviews)
Verified
Residential Commercial

2026+

Years in Business

0

103

Customer Reviews

60 km

Service Area

1-10

Employees

SurgePV Score

8.3 / 10
Customer Reviews
100%
Certifications
90%
Experience
100%
Services Range
75%
Warranty Coverage
63%
Online Presence
25%

About Green Energy Electrical

Green Energy Electrical is an Essex-based MCS, NICEIC, SafeContractor, and HIES accredited solar PV installer providing design, supply, and installation services for businesses and homes across Colchester, Chelmsford, Brentwood, Basildon, and the wider Essex area. The company is registered with Company Number 7849351.

All Green Energy Electrical installations are eligible for Smart Export Guarantee (SEG) registration because the company holds full MCS accreditation, ensuring customers can receive payments for surplus solar energy exported to the national grid. The NICEIC Approved Contractor status means all electrical work is carried out to the highest safety standards, while HIES membership provides consumers with deposit protection and insurance-backed guarantees.

The company specialises in residential and commercial solar PV systems, with battery storage available to maximise energy self-consumption. Green Energy Electrical can be reached by phone on 01277 523220. Quote requests and further information are available through their website at greenenergyelectrical.com.

Service Area

Green Energy Electrical serves the following areas within a 60 km radius:

ColchesterChelmsfordBrentwoodBasildonLondon

Are you Green Energy Electrical?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance

Certifications & Accreditations

MCS NICEIC HIES

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

No reviews yet.

Frequently Asked Questions About Green Energy Electrical

What services does Green Energy Electrical offer?

Green Energy Electrical offers Solar Installation, Battery Storage, Maintenance.

Is Green Energy Electrical MCS certified?

Yes, Green Energy Electrical is MCS certified and also holds NICEIC, HIES certifications. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Green Energy Electrical serve?

Green Energy Electrical serves Colchester, Chelmsford, Brentwood, Basildon, London. They are based in Colchester with a service radius of 60 km.

What warranty does Green Energy Electrical offer?

Green Energy Electrical offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Green Energy Electrical's customer reviews?

Green Energy Electrical has a 5/5 rating based on 103 customer reviews. Customers consistently rate them highly.

How long has Green Energy Electrical been in business?

Green Energy Electrical was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Green Energy Electrical

Fill in your details and we'll connect you with Green Energy Electrical.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote