Generate & Store
20+ years of MCS-certified solar and battery expertise across Essex and Suffolk
26+
Years in Business
74
Customer Reviews
60 km
Service Area
1-10
Employees
SurgePV Score
About Generate & Store
Generate & Store is the trading name of GS Renewables East Anglia Ltd, an MCS-certified and NICEIC-accredited solar panel and battery storage installer based at Unit 22, Systematic Business Park, Old Ipswich Road, Colchester, Essex CO7 7QL. The company has over 20 years of experience, having evolved from electrical contracting into specialised renewable energy installation.
Based just outside Colchester in Ardleigh, Generate & Store serves customers across Essex and Suffolk with solar PV installation, battery storage systems, and ongoing maintenance. The company only installs top-tier solar panels backed by UK banks and carries all necessary MCS and NICEIC accreditations. Around 95% of their work comes through customer recommendations, reflecting the strong reputation built over two decades of trading.
Generate & Store has earned Top Rated Service status on both TrustATrader and Checkatrade, and carries dozens of 5-star Google reviews. Customers consistently praise the company’s professionalism, transparent pricing, and reliable post-installation support. The team is contactable on 01206 912195 or by email at [email protected].
Service Area
Generate & Store serves the following areas within a 60 km radius:
Contact Information
Are you Generate & Store?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
5
74 reviews
Verified Customer
From first contact to final commissioning, everything was done to the highest standard. Neat, tidy, punctual and friendly. A pleasant change to find such a company.
Verified Customer
An expert consultation to begin, work started exactly as scheduled, and the installation team were highly professional and polite. I cannot recommend this company highly enough.
Frequently Asked Questions About Generate & Store
What services does Generate & Store offer?
Generate & Store offers Solar Installation, Battery Storage, Maintenance.
Is Generate & Store MCS certified?
Yes, Generate & Store is MCS certified and also holds NICEIC certification. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Generate & Store serve?
Generate & Store serves Colchester, Ipswich, Braintree, Witham, Clacton-on-Sea, Chelmsford. They are based in Colchester with a service radius of 60 km.
What warranty does Generate & Store offer?
Generate & Store offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Generate & Store's customer reviews?
Generate & Store has a 5/5 rating based on 74 customer reviews. Customers consistently rate them highly.
How long has Generate & Store been in business?
Generate & Store was founded in 2000 and has been in business for 26 years. They are one of the more experienced solar installers in their area.
Similar Installers in Colchester
Get a Free Solar Quote from Generate & Store
Fill in your details and we'll connect you with Generate & Store.
Quote request sent!
Generate & Store will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile