Bluebird Sky Solar
Locally owned Pittsburgh solar company with BBB A+ rating, serving residential and commercial clients throughout Western Pennsylvania
5+
Years in Business
25
Customer Reviews
75 mi
Service Area
11-50
Employees
SurgePV Score
About Bluebird Sky Solar
Bluebird Sky Solar is a locally owned and operated solar energy company founded in 2021, specializing in residential and commercial solar panel installation throughout the Pittsburgh area. The company operates from offices at 332 North Shore Drive, Suite 265, Pittsburgh, and 10431 Perry Highway, Suite 110 in Wexford, PA. Bluebird Sky Solar is BBB-accredited with an A+ rating.
The company provides comprehensive solar solutions including system design, permitting, installation, utility interconnection, and ongoing monitoring. Bluebird Sky Solar works with high-quality tier-1 solar panel manufacturers and installs Enphase microinverters and Tesla Powerwall battery storage systems. The company has partnered with Palmetto, a leading clean energy platform, to streamline the solar adoption process for homeowners.
Bluebird Sky Solar maintains a 4.7-star rating across review platforms, with customers praising the company’s professionalism, communication, and efficient installations. The company offers free solar consultations and serves customers Monday through Saturday from 8:00 AM to 6:00 PM.
Service Area
Bluebird Sky Solar serves the following areas within a 75-mile radius:
Contact Information
Are you Bluebird Sky Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.7
25 reviews
Brian C.
Bluebird Sky Solar installed 20 panels on our roof and the crew finished in half a day. Communication was excellent from the first consultation to the final inspection. Our system is producing more than projected.
Michelle F.
We had solar installed in a few months with a streamlined process. Bluebird handled all the permitting and utility paperwork. The installation team was courteous and left our property clean.
Daniel R.
Good experience with Bluebird Sky Solar. The sales consultation was thorough and informative. Installation went smoothly and the monitoring setup was easy. Only minor delay was with the utility inspection.
Frequently Asked Questions About Bluebird Sky Solar
What services does Bluebird Sky Solar offer?
Bluebird Sky Solar offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Grid Connection, Monitoring.
Is Bluebird Sky Solar NABCEP certified?
Bluebird Sky Solar holds the following certifications: BBB Accredited. Contact them directly for the latest accreditation details.
What areas does Bluebird Sky Solar serve?
Bluebird Sky Solar serves Pittsburgh, North Shore, Wexford, Cranberry Township, Sewickley, Moon Township. They are based in Pittsburgh with a service radius of 120 km.
What warranty does Bluebird Sky Solar offer?
Bluebird Sky Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Bluebird Sky Solar's customer reviews?
Bluebird Sky Solar has a 4.7/5 rating based on 25 customer reviews. Customers consistently rate them highly.
How long has Bluebird Sky Solar been in business?
Bluebird Sky Solar was founded in 2021 and has been in business for 5 years. They have solid experience in the solar industry.
Similar Installers in Pittsburgh
Get a Free Solar Quote from Bluebird Sky Solar
Fill in your details and we'll connect you with Bluebird Sky Solar.
Quote request sent!
Bluebird Sky Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile