Bright Solar
BBB A-rated Dallas solar company offering residential, commercial, and industrial installations across Texas
5+
Years in Business
47
Customer Reviews
62 mi
Service Area
11-50
Employees
SurgePV Score
About Bright Solar
Bright Solar is a Dallas-based solar installation company founded in 2021 and located at 1910 Pacific Ave, Suite 7082, Dallas, TX 75201. The company is a full-service EPC contractor providing residential, commercial, and industrial solar installations across all four major Texas markets: Dallas-Fort Worth, Houston, San Antonio, and Austin.
Bright Solar holds a BBB A rating and has been BBB-accredited since January 2025. The company handles every aspect of solar projects from initial consultation and system design through permitting, installation, and activation. They offer both rooftop and ground-mounted solar systems along with battery storage options.
The company has 47 customer reviews on Trustpilot with positive feedback about professional service and quality installations. Bright Solar has grown quickly since its 2021 founding to serve customers across the state of Texas.
Service Area
Bright Solar serves the following areas within a 62-mile radius:
Contact Information
Are you Bright Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.5
47 reviews
Verified Customer
Bright Solar did an excellent job on our commercial installation. The team was professional and handled all the logistics efficiently. Very satisfied with the results.
Verified Customer
Great experience with Bright Solar. The sales team was upfront about costs and timeline. Installation was clean and the system has been producing well.
Verified Customer
Good solar company with fair pricing. The installation crew was competent and respectful. Minor communication delays but overall a positive experience.
Frequently Asked Questions About Bright Solar
What services does Bright Solar offer?
Bright Solar offers Solar Installation, Battery Storage.
Is Bright Solar NABCEP certified?
Bright Solar holds the following certifications: BBB A Rating. Contact them directly for the latest accreditation details.
What areas does Bright Solar serve?
Bright Solar serves Dallas, Fort Worth, Arlington, Plano, Frisco, Houston, San Antonio, Austin. They are based in Dallas with a service radius of 100 km.
What warranty does Bright Solar offer?
Bright Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Bright Solar's customer reviews?
Bright Solar has a 4.5/5 rating based on 47 customer reviews. Customers consistently rate them highly.
How long has Bright Solar been in business?
Bright Solar was founded in 2021 and has been in business for 5 years. They have solid experience in the solar industry.
Similar Installers in Dallas
Get a Free Solar Quote from Bright Solar
Fill in your details and we'll connect you with Bright Solar.
Quote request sent!
Bright Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile