NT

North Texas Solar

BBB A+ accredited DFW solar installer since 2015 with full in-house installation crews

Dallas, Texas
5 (15 reviews)
Verified
Residential Commercial

11+

Years in Business

0

15

Customer Reviews

50 mi

Service Area

11-50

Employees

SurgePV Score

8.3 / 10
Customer Reviews
100%
Certifications
60%
Experience
85%
Services Range
75%
Warranty Coverage
80%
Online Presence
100%

About North Texas Solar

North Texas Solar is a DFW-based solar installation company founded in 2015 and located at 6624 N Riverside Drive, Suite 330, Fort Worth, TX 76137. The company serves the entire Dallas-Fort Worth metroplex with residential and commercial solar installations, off-grid power solutions, and battery backup configurations. North Texas Solar uses full-time, in-house installation crews rather than subcontractors.

The company holds an A+ BBB rating and has been BBB-accredited since 2025. North Texas Solar installs premium panels from LG and Panasonic, combined with customized system designs for each customer’s specific energy needs. They assist clients with solar system design, permitting, installation, and utility coordination throughout the process.

North Texas Solar maintains a 5.0-star rating on Angi and consistently positive reviews from customers who praise the quality materials, professional installation work, and responsive communication. The company has over 10 years of combined solar industry experience and is verified by The Good Contractors List.

Service Area

North Texas Solar serves the following areas within a 50-mile radius:

DallasFort WorthArlingtonPlanoDentonFriscoMcKinney

Are you North Texas Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
off_grid_systems

Certifications & Accreditations

BBB A+

Partner Manufacturers

Panels

LG SolarPanasonic

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

5

15 reviews

Verified Customer

30 August 2025
Verified Customer

North Texas Solar provided a clear sales presentation, quality materials, excellent design, professional installation, and polite customer service throughout.

Verified Customer

22 June 2025
Verified Customer

Outstanding job with consistent communication. The crew was friendly, neat, and efficient. They handled all permitting and utility coordination seamlessly.

Verified Customer

10 April 2025
Verified Customer

Very happy with our off-grid solar setup from North Texas Solar. The team designed a custom battery backup system that keeps our home powered during outages.

Frequently Asked Questions About North Texas Solar

What services does North Texas Solar offer?

North Texas Solar offers Solar Installation, Battery Storage, off_grid_systems.

Is North Texas Solar NABCEP certified?

North Texas Solar holds the following certifications: BBB A+. Contact them directly for the latest accreditation details.

What areas does North Texas Solar serve?

North Texas Solar serves Dallas, Fort Worth, Arlington, Plano, Denton, Frisco, McKinney. They are based in Dallas with a service radius of 80 km.

What warranty does North Texas Solar offer?

North Texas Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are North Texas Solar's customer reviews?

North Texas Solar has a 5/5 rating based on 15 customer reviews. Customers consistently rate them highly.

How long has North Texas Solar been in business?

North Texas Solar was founded in 2015 and has been in business for 11 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from North Texas Solar

Fill in your details and we'll connect you with North Texas Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote