Cambridge Solar
Solar panel design and installation specialists serving Chelmsford and Essex since 2009
17+
Years in Business
27
Customer Reviews
80 km
Service Area
1-10
Employees
SurgePV Score
About Cambridge Solar
Cambridge Solar is a solar panel installation company based at the Future Business Centre, Kings Hedges Road, Cambridge CB4 2HY. Founded in 2009, the company has over 15 years of experience designing and installing high-quality solar PV systems for domestic and commercial customers across East Anglia, including Chelmsford and wider Essex.
The company’s installation staff have completed hundreds of solar panel projects since 2009, covering a broad geographic area that includes Chelmsford, Colchester, Braintree, Harlow, and Bishop’s Stortford. Cambridge Solar identifies Chelmsford and the surrounding Essex area as strong locations for solar energy generation, given the county’s above-average sunshine hours for the UK.
Cambridge Solar specialises in solar PV design and installation, battery storage, and ongoing system maintenance. Their East Anglian base and extensive project history make them an experienced choice for Chelmsford homeowners and businesses looking for a well-established installer with a track record across the region. Further details on their services, pricing, and contact information are available through their website at cambridge-solar.co.uk.
Service Area
Cambridge Solar serves the following areas within a 80 km radius:
Contact Information
Are you Cambridge Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
No reviews yet.
Frequently Asked Questions About Cambridge Solar
What services does Cambridge Solar offer?
Cambridge Solar offers Solar Installation, Battery Storage, Maintenance.
Is Cambridge Solar MCS certified?
Yes, Cambridge Solar is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Cambridge Solar serve?
Cambridge Solar serves Chelmsford, Cambridge, Colchester, Braintree, Harlow, Bishop's Stortford. They are based in Chelmsford with a service radius of 80 km.
What warranty does Cambridge Solar offer?
Cambridge Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Cambridge Solar's customer reviews?
Cambridge Solar has a 4.9/5 rating based on 27 customer reviews. Customers consistently rate them highly.
How long has Cambridge Solar been in business?
Cambridge Solar was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.
Similar Installers in Chelmsford
Get a Free Solar Quote from Cambridge Solar
Fill in your details and we'll connect you with Cambridge Solar.
Quote request sent!
Cambridge Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile