G&

Generate & Store

NICEIC, MCS and RECC certified solar PV and battery specialists with 20+ years experience serving Chelmsford and Essex

Chelmsford, UK
5 (74 reviews)
Verified
Residential Commercial

2026+

Years in Business

0

74

Customer Reviews

60 km

Service Area

11-50

Employees

SurgePV Score

8.6 / 10
Customer Reviews
100%
Certifications
90%
Experience
100%
Services Range
75%
Warranty Coverage
63%
Online Presence
50%

About Generate & Store

Generate & Store (trading name of GS Renewables East Anglia Ltd) is an established solar PV and battery storage specialist based at Unit 22, Systematic Business Park, Old Ipswich Road, Colchester, Essex CO7 7QL. The company has evolved over more than 20 years from electrical contracting into the provision of sustainable energy solutions for customers across Essex, with Chelmsford forming a key part of their service area.

The company holds MCS certification, NICEIC Approved Contractor status, and RECC membership. Generate & Store has earned Top Rated Service status on both TrustATrader and Checkatrade, and has received dozens of 5-star Google reviews. Their long history in electrical contracting gives them strong foundations in the electrical installation and commissioning aspects of solar projects.

Services include solar PV installation, battery storage systems, and solar PV system repair and maintenance. They serve customers throughout Chelmsford and the wider Essex area. Contact them by calling 01206 912195 or emailing [email protected]. Their two decades of operational history and dual TrustATrader and Checkatrade top ratings make them one of the best-verified independent installers serving the Chelmsford area.

Service Area

Generate & Store serves the following areas within a 60 km radius:

ChelmsfordColchesterBraintreeBrentwoodBasildonHarlow

Are you Generate & Store?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance

Certifications & Accreditations

MCS NICEIC RECC

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

No reviews yet.

Frequently Asked Questions About Generate & Store

What services does Generate & Store offer?

Generate & Store offers Solar Installation, Battery Storage, Maintenance.

Is Generate & Store MCS certified?

Yes, Generate & Store is MCS certified and also holds NICEIC, RECC certifications. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Generate & Store serve?

Generate & Store serves Chelmsford, Colchester, Braintree, Brentwood, Basildon, Harlow. They are based in Chelmsford with a service radius of 60 km.

What warranty does Generate & Store offer?

Generate & Store offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Generate & Store's customer reviews?

Generate & Store has a 5/5 rating based on 74 customer reviews. Customers consistently rate them highly.

How long has Generate & Store been in business?

Generate & Store was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Generate & Store

Fill in your details and we'll connect you with Generate & Store.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote