Stag Solar Solutions
Family-run MCS and ISO 9001 certified solar installer with 700+ installations across Chelmsford and Essex since 2020
6+
Years in Business
700+
Projects Completed
6
Customer Reviews
40 km
Service Area
1-10
Employees
SurgePV Score
About Stag Solar Solutions
Stag Solar Solutions Ltd is a family-run solar installation company based at Stag House, 98 Long Common, Maldon, Chelmsford, Essex CM9 4UU. The company was incorporated in March 2020 and has since completed over 700 solar panel installations across Essex, with a strong focus on the Chelmsford, Maldon, and surrounding mid-Essex area.
Stag Solar holds MCS certification, ISO 9001 quality management accreditation, and RECC membership — a combination that demonstrates both technical standards and formal quality management processes. The company is also a certified SolarEdge battery installer, enabling them to supply and commission SolarEdge’s inverter and battery storage systems as part of integrated solar projects.
The company has a 100% recommendation rate from Referenceline customer reviews and positive Which? Trusted Trader feedback. Stag Solar customers consistently praise their professional communication, punctuality, tidy installation work, and responsive post-installation support. The company can be reached by calling 01621 983135 or emailing [email protected]. Their Maldon-Chelmsford base makes them one of the most locally focused installers for mid-Essex customers seeking a smaller, owner-managed solar company.
Service Area
Stag Solar Solutions serves the following areas within a 40 km radius:
Contact Information
Are you Stag Solar Solutions?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Batteries
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
5
6 reviews
Essex homeowner
Professional service throughout. The team communicated well, arrived on time, completed the installation neatly and followed up after commissioning to check everything was running correctly.
Frequently Asked Questions About Stag Solar Solutions
What services does Stag Solar Solutions offer?
Stag Solar Solutions offers Solar Installation, Battery Storage, Maintenance.
Is Stag Solar Solutions MCS certified?
Yes, Stag Solar Solutions is MCS certified and also holds ISO 9001, RECC certifications. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Stag Solar Solutions serve?
Stag Solar Solutions serves Chelmsford, Maldon, Heybridge, Brentwood, Basildon, Colchester. They are based in Chelmsford with a service radius of 40 km.
What warranty does Stag Solar Solutions offer?
Stag Solar Solutions offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Stag Solar Solutions's customer reviews?
Stag Solar Solutions has a 5/5 rating based on 6 customer reviews. Customers consistently rate them highly.
How long has Stag Solar Solutions been in business?
Stag Solar Solutions was founded in 2020 and has been in business for 6 years. They have solid experience in the solar industry.
Similar Installers in Chelmsford
Get a Free Solar Quote from Stag Solar Solutions
Fill in your details and we'll connect you with Stag Solar Solutions.
Quote request sent!
Stag Solar Solutions will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile