ECG Solar
Iowa's #1 rated solar company and Top Solar Contractor since 2013, with NABCEP-certified professionals
18+
Years in Business
50
Customer Reviews
124 mi
Service Area
11-50
Employees
SurgePV Score
About ECG Solar
ECG Solar, formally known as Energy Consultants Group, is one of Iowa’s most established solar installation companies. Founded in 2008 with headquarters near Cedar Rapids, ECG Solar also maintains a Des Moines office at 699 Walnut Street, 4th Floor. The company has been designated the #1 solar installer in Iowa by SolarReviews and recognized as a Top Solar Contractor in the USA by Solar Power World magazine since 2013.
ECG Solar holds NABCEP certification and is the only authorized and certified Kohler dealer and service provider in Eastern Iowa. The company provides residential and commercial solar installations, battery backup systems, and generator services across Iowa, Illinois, Wisconsin, and Minnesota.
ECG Solar handles every aspect of the solar installation process, from initial site evaluation and system design through permitting, installation, and utility interconnection. The company serves customers throughout the Des Moines metro area and across the state.
Service Area
ECG Solar serves the following areas within a 124-mile radius:
Contact Information
Are you ECG Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Batteries
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.8
50 reviews
Steve W.
Very professional team. The installation was completed according to plan and on schedule. System has been working great since it was turned on.
Karen L.
ECG Solar made the whole process easy. From the initial consultation to the final inspection, everything was handled professionally. Our energy bills have dropped significantly.
Robert D.
Good experience overall. The team was knowledgeable and answered all our questions. The installation was clean and efficient.
Frequently Asked Questions About ECG Solar
What services does ECG Solar offer?
ECG Solar offers Solar Installation, Solar Design, Battery Storage, Maintenance, Monitoring, Grid Connection.
Is ECG Solar NABCEP certified?
Yes, ECG Solar is NABCEP certified. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does ECG Solar serve?
ECG Solar serves Des Moines, West Des Moines, Cedar Rapids, Iowa City, Ankeny, Ames, Waterloo, Cedar Falls. They are based in Des Moines with a service radius of 200 km.
What warranty does ECG Solar offer?
ECG Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are ECG Solar's customer reviews?
ECG Solar has a 4.8/5 rating based on 50 customer reviews. Customers consistently rate them highly.
How long has ECG Solar been in business?
ECG Solar was founded in 2008 and has been in business for 18 years. They are one of the more experienced solar installers in their area.
Similar Installers in Des Moines
Get a Free Solar Quote from ECG Solar
Fill in your details and we'll connect you with ECG Solar.
Quote request sent!
ECG Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile