CS

CKR Solar

Custom solar and Tesla Powerwall installer serving New Orleans homeowners with residential and commercial solutions

New Orleans, Louisiana
4.5 (30 reviews)
Verified
Residential Commercial

6+

Years in Business

30

Customer Reviews

93 mi

Service Area

11-50

Employees

SurgePV Score

7.7 / 10
Customer Reviews
90%
Certifications
60%
Experience
70%
Services Range
75%
Warranty Coverage
70%
Online Presence
100%

About CKR Solar

CKR Solar & Storage is a solar installation company serving Louisiana homeowners and businesses, with headquarters in Land O’ Lakes, Florida, and regional offices across the Southeast. The company specializes in custom solar panel installations paired with battery backup systems, including Tesla Powerwall. CKR Solar provides service across Florida, Alabama, Georgia, and Louisiana.

CKR Solar offers end-to-end solar solutions for residential and commercial properties, covering system design, permitting, professional installation, and utility interconnection. As a Tesla Powerwall Certified Installer, the company focuses on integrated solar-plus-storage systems that provide both daily energy savings and backup power during outages, a particularly valuable feature for New Orleans homeowners facing hurricane season.

The company serves the greater New Orleans metro area including Metairie, Kenner, Slidell, Covington, Mandeville, and Baton Rouge. CKR Solar maintains active profiles on EnergySage and the Better Business Bureau. The company offers free consultations and detailed energy assessments to help customers understand their solar potential and expected return on investment.

Service Area

CKR Solar serves the following areas within a 93-mile radius:

New OrleansMetairieKennerSlidellCovingtonMandevilleBaton Rouge

Are you CKR Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design

Certifications & Accreditations

Tesla Powerwall Certified Installer

Partner Manufacturers

Batteries

Tesla Powerwall

Warranty Coverage

Panel Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.5

30 reviews

Verified Customer

5 October 2025
Verified Customer

CKR Solar installed panels and a Tesla Powerwall on our home in Metairie. The system kept our refrigerator and lights running during a storm outage. The installation was clean and completed on schedule.

Verified Customer

12 July 2025
Verified Customer

Good experience with CKR Solar. They designed a custom system for our roof layout and the production has been matching estimates. The monitoring app is easy to use and shows real-time data.

Verified Customer

20 April 2025
Verified Customer

We chose CKR for their expertise in solar-plus-storage systems. The Tesla Powerwall integration was seamless and the whole system works together perfectly. Very satisfied with our decision to go solar.

Frequently Asked Questions About CKR Solar

What services does CKR Solar offer?

CKR Solar offers Solar Installation, Battery Storage, Solar Design.

Is CKR Solar NABCEP certified?

CKR Solar holds the following certifications: Tesla Powerwall Certified Installer. Contact them directly for the latest accreditation details.

What areas does CKR Solar serve?

CKR Solar serves New Orleans, Metairie, Kenner, Slidell, Covington, Mandeville, Baton Rouge. They are based in New Orleans with a service radius of 150 km.

What warranty does CKR Solar offer?

CKR Solar offers 25-year panel warranty, and 10-year installation/workmanship warranty.

How are CKR Solar's customer reviews?

CKR Solar has a 4.5/5 rating based on 30 customer reviews. Customers consistently rate them highly.

How long has CKR Solar been in business?

CKR Solar was founded in 2020 and has been in business for 6 years. They have solid experience in the solar industry.

Get a Free Solar Quote from CKR Solar

Fill in your details and we'll connect you with CKR Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote