NS

Nola Solar Energy

Locally owned New Orleans solar installer providing residential solar panel installation, maintenance, and energy management

New Orleans, Louisiana
4.7 (15 reviews)
Residential

6+

Years in Business

15

Customer Reviews

50 mi

Service Area

2-10

Employees

SurgePV Score

6.1 / 10
Customer Reviews
94%
Certifications
0%
Experience
70%
Services Range
75%
Warranty Coverage
70%
Online Presence
50%

About Nola Solar Energy

Nola Solar Energy is a locally owned solar installation company based in New Orleans at 2303 Governor Nicholls Street. The company provides residential solar panel installation, maintenance, and energy management services for homeowners throughout the greater New Orleans area. Nola Solar Energy focuses exclusively on the local market, giving customers the benefit of a company that understands the specific conditions, permitting requirements, and utility landscape of the New Orleans region.

The company offers clean energy solutions designed to reduce electricity bills and provide energy independence for New Orleans homeowners. Nola Solar Energy handles the complete installation process from initial consultation and system design through permitting, installation, and ongoing monitoring support. The company is open seven days a week from 7am to 6pm, providing flexible scheduling for consultations and service calls.

Nola Solar Energy has earned positive reviews from customers who highlight the company’s professionalism, timely communication, and responsive service. As a small, locally focused installer, the company provides personal attention to each project and maintains direct relationships with customers throughout the life of their solar system.

Service Area

Nola Solar Energy serves the following areas within a 50-mile radius:

New OrleansMetairieKennerGretnaHarveyMarreroChalmette

Are you Nola Solar Energy?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Maintenance
Monitoring

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.7

15 reviews

Verified Customer

20 September 2025
Verified Customer

Nola Solar Energy is a great small business. Everything from the first phone call was efficient, professional, and polite. The team was always timely and knowledgeable with excellent communication throughout the project.

Verified Customer

12 June 2025
Verified Customer

The installation was clean and professional. They answered all our questions about how the system works and how to monitor production. Service calls have been answered within 24 hours whenever we have had a question.

Verified Customer

8 March 2025
Verified Customer

We chose Nola Solar Energy because they are locally owned and focused on the New Orleans market. The system was installed on schedule and is performing as expected. Good value for a quality installation.

Frequently Asked Questions About Nola Solar Energy

What services does Nola Solar Energy offer?

Nola Solar Energy offers Solar Installation, Maintenance, Monitoring.

Is Nola Solar Energy NABCEP certified?

Nola Solar Energy holds the following certifications: None listed. Contact them directly for the latest accreditation details.

What areas does Nola Solar Energy serve?

Nola Solar Energy serves New Orleans, Metairie, Kenner, Gretna, Harvey, Marrero, Chalmette. They are based in New Orleans with a service radius of 80 km.

What warranty does Nola Solar Energy offer?

Nola Solar Energy offers 25-year panel warranty, and 10-year installation/workmanship warranty.

How are Nola Solar Energy's customer reviews?

Nola Solar Energy has a 4.7/5 rating based on 15 customer reviews. Customers consistently rate them highly.

How long has Nola Solar Energy been in business?

Nola Solar Energy was founded in 2020 and has been in business for 6 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Nola Solar Energy

Fill in your details and we'll connect you with Nola Solar Energy.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote