Solar Installers in Louisiana
Compare top-rated solar companies across Louisiana. Read verified reviews, check certifications, and request free quotes from local installers.
Find Solar Installers by City
Browse 2 cities in Louisiana. Select a city to see local installers.
All Solar Installers in Louisiana
20 solar companies across Louisiana
EcoBuild LLC
VerifiedBBB Accredited · Louisiana Licensed Contractor
Geaux Green Solar
VerifiedLouisiana Licensed Contractor · Entergy Renewable Energy Partner
JEH Solar
VerifiedBBB A+ Rated · Louisiana Licensed Contractor
Nola Solar Energy
South Coast Solar
VerifiedNABCEP · SunPower Master Dealer · Tesla Powerwall Certified Installer · BBB A+ Rating
SunPower
Solar America
VerifiedSolar Power World #1 Residential Sales Contractor (2022-2024)
South Coast Solar
VerifiedSunPower Authorized Dealer
SunPower
Supreme Power
VerifiedBBB A+ Rating
CKR Solar
VerifiedTesla Powerwall Certified Installer
JCO Solar
VerifiedLouisiana Licensed Contractor (72777) · Sol-Ark Certified Installer · Lion Energy Certified Installer · IronRidge Certified Installer
Sol-Ark
NOLA Solar Power
Southern Exposure Solar
Solar Alternatives
VerifiedNABCEP
Baton Rouge Air
VerifiedLouisiana Licensed Contractor
Comfort Engineered Systems
VerifiedBBB Accredited
JK Renewables
Qcells + Enphase
Joule Energy
VerifiedNABCEP · Certified B Corporation
GroundUp Solar & Electrical
VerifiedLouisiana Licensed Contractor (334635) · BBB Accredited
Green Light Solar
VerifiedLouisiana Licensed Contractor (305988)
SOLR Energy
VerifiedNABCEP Certified PV Professionals · BBB Accredited
How We Rank Solar Installers
Our rankings combine verified customer reviews, certification status, years of experience, service range, and warranty coverage into a single SurgePV Score.
Customer Reviews
We aggregate ratings from Google, Yelp, BBB, and SolarReviews. Only companies with strong track records are listed.
Certifications
NABCEP certification is the US gold standard. We also check for state licensing, BBB accreditation, and manufacturer certifications.
Track Record
Years in business, projects completed, warranty coverage, and service range contribute to the overall score.
Why Trust the SurgePV Directory?
Every company listed here has been independently researched and verified. We check certifications against official registers, aggregate reviews from multiple platforms, and verify that every business is actively trading. Companies cannot pay to improve their ranking.
20
Verified Companies
764
Customer Reviews
Design Faster. Sell More.
SurgePV is the solar design platform used by installers across the US. Cut design time by 60%, generate professional proposals in minutes, and close more deals.
60%
Faster project design
10 min
Full design turnaround
Frequently Asked Questions
How much do solar panels cost in Louisiana?
Solar panel costs in Louisiana typically range from $2.50-$3.50 per watt. A standard 8kW residential system costs $20,000-$28,000. The 30% federal residential tax credit expired on December 31, 2025, so this is the full out-of-pocket cost. State and local incentives, net metering, and SRECs may help reduce your net cost.
What certifications should I look for?
NABCEP (North American Board of Certified Energy Practitioners) certification is the gold standard. At minimum, your installer should hold the required Louisiana state contractor license, carry liability insurance and workers' compensation, and have manufacturer certifications for the equipment they install.
What solar incentives are available in Louisiana?
The 30% federal residential solar tax credit expired on December 31, 2025. Homeowners in Louisiana can no longer claim this federal credit for new installations. State-level incentives may still be available, including state tax credits, rebates, property tax exemptions, sales tax exemptions, net metering, and SRECs. Commercial projects may still qualify for the federal ITC under transition rules. Check with your installer or visit the DSIRE database for current Louisiana-specific incentives.
Are You a Solar Installer in Louisiana?
List your company for free and connect with local customers looking for solar installation services.
List Your Company Free