CP

Cobalt Power Systems

SunPower Elite Dealer and Tesla Certified installer since 2003, with 4,000+ installations and 20+ years of experience

San Jose, California
4.7 (101 reviews)
Verified
Residential Commercial

23+

Years in Business

4,000+

Projects Completed

101

Customer Reviews

50 mi

Service Area

11-50

Employees

SurgePV Score

9.7 / 10
Customer Reviews
94%
Certifications
100%
Experience
100%
Services Range
100%
Warranty Coverage
80%
Online Presence
100%

About Cobalt Power Systems

Cobalt Power Systems is a solar installation company founded in 2003 and headquartered at 2557 Wyandotte Street in Mountain View, California, with a satellite office at 100 Paseo De San Antonio #319 in San Jose. Operating from a 10,000-square-foot office and warehouse, the company has completed over 4,000 installations for residential and commercial customers across the Bay Area. Cobalt Power Systems is a SunPower Elite Dealer, SunPower Commercial Dealer, and Certified Tesla Powerwall Installer, holding a California contractor’s license (C-46, #820697).

The company installs Maxeon panels and SunPower systems alongside Enphase microinverters and SolarEdge optimizers. Battery storage options include the Tesla Powerwall. Cobalt Power Systems handles every phase of the solar project, from site assessment and system design through engineering, permitting, installation, and post-installation monitoring and maintenance. The company serves both residential and commercial customers, with over two decades of experience delivering complex energy systems.

Cobalt Power Systems serves San Jose, Mountain View, Palo Alto, Sunnyvale, Santa Clara, San Francisco, Redwood City, and Fremont. With 101 reviews on Yelp and a 4.7-star average, the company maintains a strong reputation for reliable installations and responsive customer support across the Bay Area.

Service Area

Cobalt Power Systems serves the following areas within a 50-mile radius:

San JoseMountain ViewPalo AltoSunnyvaleSanta ClaraSan FranciscoRedwood CityFremont

Are you Cobalt Power Systems?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Roof Assessment
Grid Connection
Maintenance
Monitoring

Certifications & Accreditations

SunPower Elite Dealer SunPower Commercial Dealer Tesla Powerwall Certified CSLB Licensed BBB Accredited

Partner Manufacturers

Panels

MaxeonSunPower

Inverters

EnphaseSolarEdge

Batteries

Tesla Powerwall

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.7

101 reviews

Andrew L.

30 September 2025
Verified Customer

Cobalt Power Systems installed a 10 kW Maxeon system with a Tesla Powerwall. The team was incredibly professional and the system has been flawless. Over 20 years of experience really shows.

Rachel S.

15 June 2025
Verified Customer

We went with Cobalt because of their SunPower Elite status and Tesla Powerwall certification. The installation was smooth, the panels look great, and we have not paid an electric bill since.

Kevin P.

22 March 2025
Verified Customer

Experienced and reliable company. The Maxeon panels are top quality and the Enphase monitoring is excellent. Installation took three days for our larger commercial system but everything went well.

Frequently Asked Questions About Cobalt Power Systems

What services does Cobalt Power Systems offer?

Cobalt Power Systems offers Solar Installation, Battery Storage, Solar Design, Roof Assessment, Grid Connection, Maintenance, Monitoring.

Is Cobalt Power Systems NABCEP certified?

Cobalt Power Systems holds the following certifications: SunPower Elite Dealer, SunPower Commercial Dealer, Tesla Powerwall Certified, CSLB Licensed, BBB Accredited. Contact them directly for the latest accreditation details.

What areas does Cobalt Power Systems serve?

Cobalt Power Systems serves San Jose, Mountain View, Palo Alto, Sunnyvale, Santa Clara, San Francisco, Redwood City, Fremont. They are based in San Jose with a service radius of 80 km.

What warranty does Cobalt Power Systems offer?

Cobalt Power Systems offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Cobalt Power Systems's customer reviews?

Cobalt Power Systems has a 4.7/5 rating based on 101 customer reviews. Customers consistently rate them highly.

How long has Cobalt Power Systems been in business?

Cobalt Power Systems was founded in 2003 and has been in business for 23 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Cobalt Power Systems

Fill in your details and we'll connect you with Cobalt Power Systems.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote