CE

Comfort Engineered Systems

BBB-accredited HVAC, generator, and solar company serving coastal Louisiana since 2001

New Orleans, Louisiana
4.3 (45 reviews)
Verified
Residential Commercial

25+

Years in Business

45

Customer Reviews

93 mi

Service Area

11-50

Employees

SurgePV Score

8.2 / 10
Customer Reviews
86%
Certifications
60%
Experience
100%
Services Range
75%
Warranty Coverage
70%
Online Presence
100%

About Comfort Engineered Systems

Comfort Engineered Systems is a New Orleans-based energy services company founded in 2001, located at 1401 Distributors Row. The company provides HVAC, generator, and solar installation services across the coastal areas of Louisiana, Mississippi, and Alabama. BBB Accredited since 2013, Comfort Engineered Systems has built a sterling reputation among homeowners and business owners in the Gulf South region.

The company’s solar division installs panels, inverters, and backup battery systems for residential and commercial customers. All solar installations are performed by experienced solar technicians who understand the unique conditions of the Gulf Coast, including hurricane preparedness and high humidity environments. Comfort Engineered Systems’ ability to integrate solar with HVAC, generator, and electrical systems provides customers with a comprehensive whole-home energy solution from a single provider.

Comfort Engineered Systems was named a Nextdoor Neighborhood Favorite in 2021, reflecting strong community trust. The company serves the greater New Orleans area including Metairie, Kenner, Slidell, Covington, Mandeville, and extends into Mississippi. Customers benefit from the company’s 24-year track record and deep familiarity with the local energy landscape, permitting requirements, and Entergy interconnection procedures.

Service Area

Comfort Engineered Systems serves the following areas within a 93-mile radius:

New OrleansMetairieKennerSlidellCovingtonMandevilleHoumaGulfport

Are you Comfort Engineered Systems?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design

Certifications & Accreditations

BBB Accredited

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.3

45 reviews

Verified Customer

30 September 2025
Verified Customer

Comfort Engineered Systems installed solar panels and a backup battery on our home. Having one company handle our HVAC, generator, and solar means everything is integrated properly. The solar system has significantly reduced our monthly Entergy bill.

Verified Customer

15 June 2025
Verified Customer

We have been a customer since they installed our HVAC 13 years ago, so we trusted them with our solar installation. The work was professional and the system is performing well. They know our house and energy needs thoroughly.

Verified Customer

22 March 2025
Verified Customer

Good solar installation from a company with over 20 years of experience in the area. The fact that they also service generators and HVAC systems means they understand whole-home energy management. Responsive when we had a monitoring question.

Frequently Asked Questions About Comfort Engineered Systems

What services does Comfort Engineered Systems offer?

Comfort Engineered Systems offers Solar Installation, Battery Storage, Solar Design.

Is Comfort Engineered Systems NABCEP certified?

Comfort Engineered Systems holds the following certifications: BBB Accredited. Contact them directly for the latest accreditation details.

What areas does Comfort Engineered Systems serve?

Comfort Engineered Systems serves New Orleans, Metairie, Kenner, Slidell, Covington, Mandeville, Houma, Gulfport. They are based in New Orleans with a service radius of 150 km.

What warranty does Comfort Engineered Systems offer?

Comfort Engineered Systems offers 25-year panel warranty, and 10-year installation/workmanship warranty.

How are Comfort Engineered Systems's customer reviews?

Comfort Engineered Systems has a 4.3/5 rating based on 45 customer reviews. They are well-regarded by their customers.

How long has Comfort Engineered Systems been in business?

Comfort Engineered Systems was founded in 2001 and has been in business for 25 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Comfort Engineered Systems

Fill in your details and we'll connect you with Comfort Engineered Systems.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote