Cosmic Solar & Roofing
San Diego solar and roofing company with 100% customer satisfaction and 90% referral rate
22+
Years in Business
127
Customer Reviews
50 mi
Service Area
11-50
Employees
SurgePV Score
About Cosmic Solar & Roofing
Cosmic Solar & Roofing is a San Diego-based solar and roofing company founded in 2004 by Bahram Shadzi. Headquartered at 943 Poinsettia Ave, Suite 401 in Vista, the company provides residential and commercial solar panel installations alongside roofing services across San Diego County. The company reports a 100% customer satisfaction rating, with 90% of its business coming from client referrals.
Cosmic Solar & Roofing holds an A+ rating with the Better Business Bureau and is CSLB licensed. The company was named Vista Small Business of the Year and has built a reputation for high-quality installations with strong post-installation support. By combining solar and roofing under one contractor, Cosmic Solar simplifies the process for homeowners who need both services.
On Google, Cosmic Solar holds a 4.9-star rating, and the company has a 4.5-star rating on Yelp from 127 reviews. Customers consistently highlight the company’s honesty, craftsmanship, and responsiveness. The service department can be reached at [email protected] or by phone and text at (442) 217-9990.
Service Area
Cosmic Solar & Roofing serves the following areas within a 50-mile radius:
Contact Information
Are you Cosmic Solar & Roofing?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.9
127 reviews
Michelle G.
Cosmic Solar handled our roof and solar installation together. Bahram and his team were professional, on time, and delivered exactly what they promised.
Richard A.
We were referred to Cosmic by our neighbors and had the same great experience they described. Fair pricing and excellent workmanship.
Donna F.
Outstanding service from consultation to installation. The team was knowledgeable and answered all our questions. System is producing more than expected.
Frequently Asked Questions About Cosmic Solar & Roofing
What services does Cosmic Solar & Roofing offer?
Cosmic Solar & Roofing offers Solar Installation, Battery Storage, roofing, Maintenance.
Is Cosmic Solar & Roofing NABCEP certified?
Cosmic Solar & Roofing holds the following certifications: BBB Accredited, CSLB Licensed. Contact them directly for the latest accreditation details.
What areas does Cosmic Solar & Roofing serve?
Cosmic Solar & Roofing serves San Diego, Vista, Oceanside, Carlsbad, Escondido, Encinitas, Valley Center. They are based in San Diego with a service radius of 80 km.
What warranty does Cosmic Solar & Roofing offer?
Cosmic Solar & Roofing offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Cosmic Solar & Roofing's customer reviews?
Cosmic Solar & Roofing has a 4.9/5 rating based on 127 customer reviews. Customers consistently rate them highly.
How long has Cosmic Solar & Roofing been in business?
Cosmic Solar & Roofing was founded in 2004 and has been in business for 22 years. They are one of the more experienced solar installers in their area.
Similar Installers in San Diego
Get a Free Solar Quote from Cosmic Solar & Roofing
Fill in your details and we'll connect you with Cosmic Solar & Roofing.
Quote request sent!
Cosmic Solar & Roofing will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile