Del Sol Energy
Reno solar installer with a downtown showroom, 30+ years combined experience, and a BBB A rating
12+
Years in Business
12
Customer Reviews
50 mi
Service Area
11-50
Employees
SurgePV Score
About Del Sol Energy
Del Sol Energy is a solar installation company located at 124 Ridge Street, Suite D, Reno, NV 89501. Founded in 2014 by Josh Aldrich (CEO) and Matt Turville (COO), the company brings over 30 combined years of solar industry experience to residential and commercial projects.
Del Sol Energy holds Nevada Contractor License 0086376 and California License 1008525, with a BBB A rating. The company operates a solar showroom and design center in downtown Reno where customers can view equipment options before making decisions. All residential installations are handled in-house from engineering and permitting through installation, service, and warranty management.
Del Sol Energy serves the greater Reno-Sparks area, Carson City, and additional locations in Northern and Southern Nevada.
Service Area
Del Sol Energy serves the following areas within a 50-mile radius:
Contact Information
Are you Del Sol Energy?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.6
12 reviews
Verified Customer
Del Sol Energy installed a system on our downtown Reno property. We visited their showroom first, which helped us understand our options before committing. Professional installation and good follow-up.
Verified Customer
Good local solar company with competitive pricing. They handled all engineering and permitting in-house. The system is producing as estimated.
Verified Customer
The founders' decades of solar experience showed in the quality of our installation. Clean workmanship and attention to detail. Our energy costs have dropped significantly.
Frequently Asked Questions About Del Sol Energy
What services does Del Sol Energy offer?
Del Sol Energy offers Solar Installation, Battery Storage, Maintenance.
Is Del Sol Energy NABCEP certified?
Del Sol Energy holds the following certifications: BBB A Rating, Nevada License (0086376), California License (1008525). Contact them directly for the latest accreditation details.
What areas does Del Sol Energy serve?
Del Sol Energy serves Reno, Sparks, Carson City, Fernley. They are based in Reno with a service radius of 80 km.
What warranty does Del Sol Energy offer?
Del Sol Energy offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Del Sol Energy's customer reviews?
Del Sol Energy has a 4.6/5 rating based on 12 customer reviews. Customers consistently rate them highly.
How long has Del Sol Energy been in business?
Del Sol Energy was founded in 2014 and has been in business for 12 years. They are one of the more experienced solar installers in their area.
Similar Installers in Reno
Get a Free Solar Quote from Del Sol Energy
Fill in your details and we'll connect you with Del Sol Energy.
Quote request sent!
Del Sol Energy will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile