DES Renewable Energy
MCS, NAPIT, and Tesla Powerwall-certified solar installer serving Salisbury from Dorset
10+
Years in Business
220
Customer Reviews
60 km
Service Area
11-50
Employees
SurgePV Score
About DES Renewable Energy
DES Renewable Energy Ltd is a solar PV and battery storage installer based in Wimborne, Dorset, with a Salisbury presence at 2 Salt Lane, Salisbury SP1 1DU. The company is part of Dorset Electrical Solutions and has been installing solar PV for close to a decade. DES Renewable Energy holds MCS and NAPIT certifications, is a City & Guilds-qualified organisation, and is a member of the Renewable Energy Consumer Code (RECC). The company is also a Tesla Powerwall Certified Installer and an Octopus Trusted Partner.
DES Renewable Energy installs solar PV, battery storage (including Tesla Powerwall, GivEnergy, Fox ESS, Growatt, Sun Synk, and Solax Power), and EV charging points. All installations are carried out by fully employed MCS-accredited engineers — the company does not outsource any part of the installation process. IWA Deposit and Guarantee Protection is included.
DES Renewable Energy holds a 5-star Trustpilot rating from 220 reviews and a score of 9.7/10 on Checkatrade from over 200 reviews. Customers consistently praise the honest, no-pressure approach, clear communication throughout the project, and professional workmanship. Contact is available on 01202 985888 or at [email protected].
Service Area
DES Renewable Energy serves the following areas within a 60 km radius:
Contact Information
Are you DES Renewable Energy?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Batteries
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
5
220 reviews
Trustpilot Customer
Excellent customer service — quick to respond and quality products at competitive prices. They kept us informed throughout the entire process from consultation to post-installation support.
Trustpilot Customer
Very professional and easy to deal with. The team is polite and did a great, neat installation. A great company that I would recommend without hesitation.
Frequently Asked Questions About DES Renewable Energy
What services does DES Renewable Energy offer?
DES Renewable Energy offers Solar Installation, Battery Storage, EV Charging.
Is DES Renewable Energy MCS certified?
Yes, DES Renewable Energy is MCS certified and also holds NAPIT, RECC certifications. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does DES Renewable Energy serve?
DES Renewable Energy serves Salisbury, Andover, Bournemouth, Poole, Wimborne, Blandford Forum. They are based in Salisbury with a service radius of 60 km.
What warranty does DES Renewable Energy offer?
DES Renewable Energy offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are DES Renewable Energy's customer reviews?
DES Renewable Energy has a 5/5 rating based on 220 customer reviews. Customers consistently rate them highly.
How long has DES Renewable Energy been in business?
DES Renewable Energy was founded in 2016 and has been in business for 10 years. They are one of the more experienced solar installers in their area.
Similar Installers in Salisbury
Get a Free Solar Quote from DES Renewable Energy
Fill in your details and we'll connect you with DES Renewable Energy.
Quote request sent!
DES Renewable Energy will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile