GHE Solar
MCS-accredited solar PV installer with 40,000+ installations since 2009 serving Wiltshire and Salisbury
17+
Years in Business
88
Customer Reviews
80 km
Service Area
51-200
Employees
SurgePV Score
About GHE Solar
GHE Solar Ltd is a solar PV installation company founded in 2009 and based at 21 Kingfisher Court, Hambridge Road, Newbury, Berkshire RG14 5SJ. The company can be reached on 01635 529090 or at [email protected]. GHE Solar is MCS accredited and has completed over 40,000 solar panel installations across its service area.
The company serves Berkshire, Hampshire, Wiltshire, Oxfordshire, Buckinghamshire, and Surrey. Within Wiltshire, GHE Solar covers Salisbury, Swindon, Trowbridge, and Chippenham. The company specialises in domestic solar PV, energy storage systems, and EV charging points for homeowners and businesses.
GHE Solar’s MCS accreditation provides customers with assurance that all installations are designed, installed, and commissioned to the highest standard using only certified products. Customer reviews consistently describe the team as friendly, knowledgeable, and professional, with several reviewers citing the quality of the engineer’s explanations during handover. GHE Solar is listed on the Referenceline platform for verified customer references.
Service Area
GHE Solar serves the following areas within a 80 km radius:
Contact Information
Are you GHE Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
4.8
88 reviews
Referenceline Customer
Very friendly, knowledgeable, and professional team. Impressed with the engineer's efficiency and all the team at GHE. Would not hesitate to recommend GHE to anyone considering a similar install.
Referenceline Customer
Very impressed with the efficiency of the engineer and all the team at GHE. Everything explained clearly and the install was clean and tidy. Highly recommend.
Frequently Asked Questions About GHE Solar
What services does GHE Solar offer?
GHE Solar offers Solar Installation, Battery Storage, EV Charging.
Is GHE Solar MCS certified?
Yes, GHE Solar is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does GHE Solar serve?
GHE Solar serves Salisbury, Andover, Winchester, Swindon, Trowbridge, Newbury. They are based in Salisbury with a service radius of 80 km.
What warranty does GHE Solar offer?
GHE Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are GHE Solar's customer reviews?
GHE Solar has a 4.8/5 rating based on 88 customer reviews. Customers consistently rate them highly.
How long has GHE Solar been in business?
GHE Solar was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.
Similar Installers in Salisbury
Get a Free Solar Quote from GHE Solar
Fill in your details and we'll connect you with GHE Solar.
Quote request sent!
GHE Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile