DES Renewable Energy Wiltshire
MCS and NAPIT-certified local solar installer based in Salisbury city centre
10+
Years in Business
220
Customer Reviews
40 km
Service Area
11-50
Employees
SurgePV Score
About DES Renewable Energy Wiltshire
DES Renewable Energy operates a dedicated Wiltshire and Salisbury branch at 2 Salt Lane, Salisbury SP1 1DU. The Wiltshire branch serves local homeowners and businesses with the same MCS and NAPIT-certified installation team that has built the company’s reputation across Dorset and the South Coast.
DES Renewable Energy Wiltshire installs solar PV, battery storage (including Tesla Powerwall and GivEnergy), and EV charging points. The company does not subcontract any installation work — all projects are handled end-to-end by fully employed, MCS-accredited engineers. IWA Deposit and Guarantee Protection is provided on all installations.
The Wiltshire branch covers Salisbury, Amesbury, Devizes, Andover, Tidworth, and Pewsey. With a central Salisbury city location on Salt Lane, the team can reach customers across south and central Wiltshire efficiently. DES Renewable Energy holds a 5-star Trustpilot rating (220 reviews) and a 9.7/10 score on Checkatrade from over 200 verified reviews.
Service Area
DES Renewable Energy Wiltshire serves the following areas within a 40 km radius:
Contact Information
Are you DES Renewable Energy Wiltshire?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Batteries
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
5
220 reviews
Checkatrade Customer
Very professional and easy to deal with. Polite team and a great, neat installation job. I would recommend without hesitation.
Checkatrade Customer
Efficient, competitive pricing, and the team did an excellent job. All paperwork handled promptly and the system was up and running as promised.
Frequently Asked Questions About DES Renewable Energy Wiltshire
What services does DES Renewable Energy Wiltshire offer?
DES Renewable Energy Wiltshire offers Solar Installation, Battery Storage, EV Charging.
Is DES Renewable Energy Wiltshire MCS certified?
Yes, DES Renewable Energy Wiltshire is MCS certified and also holds NAPIT certification. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does DES Renewable Energy Wiltshire serve?
DES Renewable Energy Wiltshire serves Salisbury, Amesbury, Devizes, Andover, Tidworth, Pewsey. They are based in Salisbury with a service radius of 40 km.
What warranty does DES Renewable Energy Wiltshire offer?
DES Renewable Energy Wiltshire offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are DES Renewable Energy Wiltshire's customer reviews?
DES Renewable Energy Wiltshire has a 5/5 rating based on 220 customer reviews. Customers consistently rate them highly.
How long has DES Renewable Energy Wiltshire been in business?
DES Renewable Energy Wiltshire was founded in 2016 and has been in business for 10 years. They are one of the more experienced solar installers in their area.
Similar Installers in Salisbury
Get a Free Solar Quote from DES Renewable Energy Wiltshire
Fill in your details and we'll connect you with DES Renewable Energy Wiltshire.
Quote request sent!
DES Renewable Energy Wiltshire will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile