EP

Eagle Point Solar

Iowa's largest solar installer with over 100 NABCEP-certified employees serving residential, commercial, and agricultural customers since 2010

Des Moines, Iowa
4.5 (40 reviews)
Verified
Residential Commercial

16+

Years in Business

0

40

Customer Reviews

124 mi

Service Area

51-200

Employees

SurgePV Score

8.9 / 10
Customer Reviews
90%
Certifications
75%
Experience
100%
Services Range
100%
Warranty Coverage
63%
Online Presence
100%

About Eagle Point Solar

Eagle Point Solar is one of the largest solar installers in the Midwest, founded in 2010 with headquarters in Dubuque, Iowa and a Des Moines office at 1955 NE 58th Avenue, Suite 201. The company employs over 100 full-time staff members, many holding NABCEP certifications and storage design and installation credentials.

Eagle Point Solar provides system design and engineering, sales, permitting, installation, and ongoing maintenance services for residential, commercial, agricultural, government, and utility customers across Iowa, Illinois, and Wisconsin. The company holds A+ BBB accreditation and is a member of SEIA and ASES.

The company has installed solar systems for homes, small businesses, large commercial facilities, farms, local government buildings, academic institutions, and local utilities. Eagle Point Solar also offers community solar programs and solar repair and maintenance services from its Des Moines and Dubuque offices.

Service Area

Eagle Point Solar serves the following areas within a 124-mile radius:

Des MoinesDubuqueCedar RapidsIowa CityAnkenyAmesWaterloo

Are you Eagle Point Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Solar Design
Battery Storage
Maintenance
Monitoring
Grid Connection

Certifications & Accreditations

NABCEP SEIA

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.5

40 reviews

Scott B.

22 August 2025
Verified Customer

Eagle Point Solar handled our commercial installation with professionalism from start to finish. The crew was efficient and friendly, and the system is exceeding our energy production estimates.

Linda M.

10 May 2025
Verified Customer

Great experience with our residential solar installation. The team was knowledgeable and walked us through every step. Our energy bills have dropped dramatically.

Doug T.

14 February 2025
Verified Customer

Solid installation and good system design. The permitting process took a bit longer than expected, but Eagle Point kept us informed throughout.

Frequently Asked Questions About Eagle Point Solar

What services does Eagle Point Solar offer?

Eagle Point Solar offers Solar Installation, Solar Design, Battery Storage, Maintenance, Monitoring, Grid Connection.

Is Eagle Point Solar NABCEP certified?

Yes, Eagle Point Solar is NABCEP certified and also holds SEIA certification. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does Eagle Point Solar serve?

Eagle Point Solar serves Des Moines, Dubuque, Cedar Rapids, Iowa City, Ankeny, Ames, Waterloo. They are based in Des Moines with a service radius of 200 km.

What warranty does Eagle Point Solar offer?

Eagle Point Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Eagle Point Solar's customer reviews?

Eagle Point Solar has a 4.5/5 rating based on 40 customer reviews. Customers consistently rate them highly.

How long has Eagle Point Solar been in business?

Eagle Point Solar was founded in 2010 and has been in business for 16 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Eagle Point Solar

Fill in your details and we'll connect you with Eagle Point Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote