ES

Eagle Solar Power

DFW solar installer in Mansfield offering panel installations, battery storage, and system maintenance

Arlington, Texas
5 (20 reviews)
Verified
Residential Commercial

7+

Years in Business

0

20

Customer Reviews

50 mi

Service Area

11-50

Employees

SurgePV Score

7.8 / 10
Customer Reviews
100%
Certifications
60%
Experience
70%
Services Range
90%
Warranty Coverage
63%
Online Presence
75%

About Eagle Solar Power

Eagle Solar Power is a solar installation company based at 5738 Newt Patterson Road, Suite B, in Mansfield, Texas, serving the Dallas-Fort Worth metroplex including Arlington, Grand Prairie, and surrounding communities. The company provides residential and commercial solar panel installations with battery storage options and ongoing maintenance services.

Eagle Solar Power handles the complete installation process from system design and permitting through installation and utility interconnection with Oncor. The company offers cleaning and maintenance services and financing assistance to help homeowners manage the cost of going solar.

The company maintains BBB accreditation and a 5.0-star rating on EcoWatch. Eagle Solar Power operates Monday through Friday, 7:00 AM to 6:00 PM, and provides free quotes for solar installations across the DFW area.

Service Area

Eagle Solar Power serves the following areas within a 50-mile radius:

ArlingtonMansfieldGrand PrairieFort WorthDallasMidlothian

Are you Eagle Solar Power?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance
Solar Design

Certifications & Accreditations

BBB Accredited

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

5

20 reviews

Jason T.

18 August 2025
Verified Customer

Eagle Solar Power did an excellent job on our Arlington home. The crew was on time, professional, and finished the installation in one day. Battery storage integration was seamless.

Michelle K.

25 May 2025
Verified Customer

We got quotes from five companies and Eagle Solar had the best combination of price and quality. The system has been producing above their estimates for three months.

Brandon L.

12 February 2025
Verified Customer

Professional installation and responsive customer service. They handled all the Oncor paperwork and our system was activated within a few weeks of installation.

Frequently Asked Questions About Eagle Solar Power

What services does Eagle Solar Power offer?

Eagle Solar Power offers Solar Installation, Battery Storage, Maintenance, Solar Design.

Is Eagle Solar Power NABCEP certified?

Eagle Solar Power holds the following certifications: BBB Accredited. Contact them directly for the latest accreditation details.

What areas does Eagle Solar Power serve?

Eagle Solar Power serves Arlington, Mansfield, Grand Prairie, Fort Worth, Dallas, Midlothian. They are based in Arlington with a service radius of 80 km.

What warranty does Eagle Solar Power offer?

Eagle Solar Power offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Eagle Solar Power's customer reviews?

Eagle Solar Power has a 5/5 rating based on 20 customer reviews. Customers consistently rate them highly.

How long has Eagle Solar Power been in business?

Eagle Solar Power was founded in 2019 and has been in business for 7 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Eagle Solar Power

Fill in your details and we'll connect you with Eagle Solar Power.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote