SU

Solartime USA

Richardson-based solar installer serving the DFW area with consultation, permit assistance, and maintenance services

Arlington, Texas
5 (20 reviews)
Verified
Residential Commercial

11+

Years in Business

0

20

Customer Reviews

62 mi

Service Area

11-50

Employees

SurgePV Score

8.4 / 10
Customer Reviews
100%
Certifications
60%
Experience
85%
Services Range
90%
Warranty Coverage
63%
Online Presence
100%

About Solartime USA

Solartime USA is a solar installation company based at 1758 Firman Drive, Suite 100, in Richardson, Texas, serving Arlington and the greater Dallas-Fort Worth metroplex. The company provides residential and commercial solar panel installations with consultation, permit assistance, cleaning and maintenance, and financing options.

Solartime USA handles the complete installation process from initial consultation and system design through permitting, installation, and utility interconnection with Oncor. The company offers ongoing maintenance services to keep solar systems performing at peak efficiency.

The company has earned a 5.0-star rating on EcoWatch and maintains BBB accreditation. Solartime USA serves a wide area across the DFW metroplex including Arlington, Richardson, Dallas, Fort Worth, Plano, and surrounding communities.

Service Area

Solartime USA serves the following areas within a 62-mile radius:

ArlingtonRichardsonDallasFort WorthPlanoGarlandMesquite

Are you Solartime USA?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Maintenance
Solar Design
Grid Connection

Certifications & Accreditations

BBB Accredited

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

5

20 reviews

Joshua M.

22 August 2025
Verified Customer

Solartime USA handled our Arlington home installation from consultation through final inspection. The permit assistance saved us a lot of hassle. Great team.

Michelle H.

14 May 2025
Verified Customer

Professional installation and excellent follow-up service. They offer maintenance packages that give us peace of mind. System performs as promised.

Ryan G.

8 February 2025
Verified Customer

We chose Solartime for their transparent pricing and local reputation. The consultation was thorough and the installation was completed on schedule.

Frequently Asked Questions About Solartime USA

What services does Solartime USA offer?

Solartime USA offers Solar Installation, Maintenance, Solar Design, Grid Connection.

Is Solartime USA NABCEP certified?

Solartime USA holds the following certifications: BBB Accredited. Contact them directly for the latest accreditation details.

What areas does Solartime USA serve?

Solartime USA serves Arlington, Richardson, Dallas, Fort Worth, Plano, Garland, Mesquite. They are based in Arlington with a service radius of 100 km.

What warranty does Solartime USA offer?

Solartime USA offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Solartime USA's customer reviews?

Solartime USA has a 5/5 rating based on 20 customer reviews. Customers consistently rate them highly.

How long has Solartime USA been in business?

Solartime USA was founded in 2015 and has been in business for 11 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Solartime USA

Fill in your details and we'll connect you with Solartime USA.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote