TS

Texas Solar Professional

EnergySage Installer of the Year providing solar, battery, HVAC, and permit assistance across DFW

Arlington, Texas
5 (18 reviews)
Verified
Residential Commercial

6+

Years in Business

0

18

Customer Reviews

62 mi

Service Area

11-50

Employees

SurgePV Score

8.1 / 10
Customer Reviews
100%
Certifications
75%
Experience
70%
Services Range
90%
Warranty Coverage
63%
Online Presence
75%

About Texas Solar Professional

Texas Solar Professional is a solar installation company headquartered at 545 Jealouse Way in Cedar Hill, Texas, serving the Dallas-Fort Worth metroplex including Arlington, Grand Prairie, and surrounding communities. The company was recognized as the EnergySage Installer of the Year for its quality installations and customer service.

Texas Solar Professional provides residential and commercial solar panel installations along with battery storage systems, HVAC services, and grid-tied system connections. The company handles permit assistance and financing options, guiding customers through the installation process from design to utility interconnection with Oncor.

The company is GAF certified and has earned a 5.0-star rating on EcoWatch. Texas Solar Professional serves a wide area across the DFW metroplex, providing free consultations and customized solar system designs.

Service Area

Texas Solar Professional serves the following areas within a 62-mile radius:

ArlingtonCedar HillDallasFort WorthGrand PrairieMansfieldMidlothian

Are you Texas Solar Professional?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Grid Connection

Certifications & Accreditations

EnergySage Installer of the Year GAF Certified

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

5

18 reviews

Kevin W.

10 September 2025
Verified Customer

Texas Solar Professional earned their Installer of the Year title. From the first consultation to the final inspection, everything was handled with expertise and professionalism.

Rachel H.

18 June 2025
Verified Customer

They handled our permit assistance and grid connection with Oncor efficiently. The system was up and running faster than expected. Competitive pricing too.

Steven M.

5 March 2025
Verified Customer

Excellent communication throughout the process. The battery storage system they recommended has been perfect for backup power during Texas storms.

Frequently Asked Questions About Texas Solar Professional

What services does Texas Solar Professional offer?

Texas Solar Professional offers Solar Installation, Battery Storage, Solar Design, Grid Connection.

Is Texas Solar Professional NABCEP certified?

Texas Solar Professional holds the following certifications: EnergySage Installer of the Year, GAF Certified. Contact them directly for the latest accreditation details.

What areas does Texas Solar Professional serve?

Texas Solar Professional serves Arlington, Cedar Hill, Dallas, Fort Worth, Grand Prairie, Mansfield, Midlothian. They are based in Arlington with a service radius of 100 km.

What warranty does Texas Solar Professional offer?

Texas Solar Professional offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Texas Solar Professional's customer reviews?

Texas Solar Professional has a 5/5 rating based on 18 customer reviews. Customers consistently rate them highly.

How long has Texas Solar Professional been in business?

Texas Solar Professional was founded in 2020 and has been in business for 6 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Texas Solar Professional

Fill in your details and we'll connect you with Texas Solar Professional.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote