Earth Electric
NABCEP-certified local solar and storage installer in San Jose since 2009, with 149+ reviews and hands-on owner involvement
17+
Years in Business
149
Customer Reviews
50 mi
Service Area
1-10
Employees
SurgePV Score
About Earth Electric
Earth Electric is a licensed, NABCEP-certified electrical contracting company specializing in solar installation, based at 1702 Meridian Avenue in San Jose, California. Founded in 2009, the company has built a strong local reputation as a small but dedicated solar installer with hands-on owner involvement in every project. Earth Electric holds 149 reviews on Yelp with an average rating of 4.9 stars, making it one of the highest-rated solar installers in the San Jose area.
The company installs Tier 1 solar panels from manufacturers including REC and Panasonic, paired with Enphase microinverters. Earth Electric handles residential solar and storage installations from initial consultation through design, permitting, installation, and city inspection. The company’s small size allows for personalized attention on each project, with the owner directly overseeing installations.
Earth Electric serves the greater San Jose area, extending to Santa Cruz, Gilroy, and surrounding South Bay communities. The company’s NABCEP certification and licensed electrical contractor status ensure all work meets industry best practices and local code requirements. Customers consistently praise the company’s transparency, clean workmanship, and honest pricing.
Service Area
Earth Electric serves the following areas within a 50-mile radius:
Contact Information
Are you Earth Electric?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.9
149 reviews
Steven F.
Earth Electric is a small company that delivers big results. The owner was personally involved in our project and the installation crew was excellent. System is producing exactly as estimated.
Michelle R.
We chose Earth Electric after reading their Yelp reviews and they did not disappoint. Great communication, clean installation, and fair pricing. Our 7 kW system was up and running in two weeks.
Carlos G.
Highly recommend Earth Electric. They took the time to explain everything and designed a system that fits our roof perfectly. The Enphase microinverters make it easy to monitor each panel individually.
Frequently Asked Questions About Earth Electric
What services does Earth Electric offer?
Earth Electric offers Solar Installation, Battery Storage, Solar Design, Grid Connection, Maintenance.
Is Earth Electric NABCEP certified?
Yes, Earth Electric is NABCEP certified and also holds Licensed Electrical Contractor certification. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does Earth Electric serve?
Earth Electric serves San Jose, Santa Clara, Campbell, Santa Cruz, Gilroy, Los Gatos, Morgan Hill. They are based in San Jose with a service radius of 80 km.
What warranty does Earth Electric offer?
Earth Electric offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Earth Electric's customer reviews?
Earth Electric has a 4.9/5 rating based on 149 customer reviews. Customers consistently rate them highly.
How long has Earth Electric been in business?
Earth Electric was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.
Similar Installers in San Jose
Get a Free Solar Quote from Earth Electric
Fill in your details and we'll connect you with Earth Electric.
Quote request sent!
Earth Electric will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile