ES

Eco Solar Hawaii

Hawaii's only SunPower Master Dealer and Tesla Powerwall Premier Installer serving Oahu for over 16 years

Honolulu, Hawaii
4.7 (204 reviews)
Verified
Residential

18+

Years in Business

0

204

Customer Reviews

37 mi

Service Area

11-50

Employees

SurgePV Score

9.7 / 10
Customer Reviews
94%
Certifications
100%
Experience
100%
Services Range
100%
Warranty Coverage
80%
Online Presence
100%

About Eco Solar Hawaii

Eco Solar Hawaii is a residential solar installer headquartered at 94-1388 Moaniani St, Suite 229, in Waipahu. Founded in 2008, the company holds the distinction of being Hawaii’s only SunPower Master Dealer and Maxeon Preferred Partner, giving customers access to some of the highest-efficiency solar panels available. Eco Solar is also a Tesla Powerwall Premier Installer, offering integrated solar and battery storage solutions for Oahu homeowners.

The company installs SunPower and Maxeon solar panels, which are known for producing more energy per square foot than conventional panels. This is particularly relevant in Hawaii where roof space can be limited and electricity costs are among the highest in the nation. Eco Solar pairs these panels with Enphase and SolarEdge inverters and Tesla Powerwall battery storage. The company handles system design, permitting, installation, monitoring, and ongoing maintenance.

Eco Solar Hawaii holds a 4.7-star rating on both Yelp and Google Reviews from 204 combined reviews. The company maintains an A+ BBB rating and a BuildZoom score that places them above 98% of contractors in Hawaii. Customers highlight the premium equipment quality, professional installations, and the long-term performance of SunPower panels. The company’s SunPower partnership also provides customers with an industry-leading 25-year complete system warranty.

Service Area

Eco Solar Hawaii serves the following areas within a 37-mile radius:

HonoluluWaipahuPearl CityKapoleiEwa BeachMililaniKailua

Are you Eco Solar Hawaii?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Energy Audit
Grid Connection
Monitoring
Maintenance

Certifications & Accreditations

BBB A+ Rated SunPower Master Dealer Maxeon Preferred Partner Tesla Powerwall Premier Installer

Partner Manufacturers

Panels

SunPowerMaxeon

Inverters

EnphaseSolarEdge

Batteries

Tesla Powerwall

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.7

204 reviews

Lani K.

2 November 2025
Verified Customer

Eco Solar installed our SunPower system and Tesla Powerwall. The panels are the most efficient on the market and our HECO bill is basically zero now. Outstanding service from the team.

Brian M.

19 August 2025
Verified Customer

Went with Eco Solar because they're the only SunPower dealer in Hawaii. Premium product with premium service. The install crew was fast and professional.

Wendy T.

7 May 2025
Verified Customer

Great product and good installation. SunPower panels produce noticeably more than the standard panels my neighbor has. The price was higher but the output justifies it.

Frequently Asked Questions About Eco Solar Hawaii

What services does Eco Solar Hawaii offer?

Eco Solar Hawaii offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Grid Connection, Monitoring, Maintenance.

Is Eco Solar Hawaii NABCEP certified?

Eco Solar Hawaii holds the following certifications: BBB A+ Rated, SunPower Master Dealer, Maxeon Preferred Partner, Tesla Powerwall Premier Installer. Contact them directly for the latest accreditation details.

What areas does Eco Solar Hawaii serve?

Eco Solar Hawaii serves Honolulu, Waipahu, Pearl City, Kapolei, Ewa Beach, Mililani, Kailua. They are based in Honolulu with a service radius of 60 km.

What warranty does Eco Solar Hawaii offer?

Eco Solar Hawaii offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Eco Solar Hawaii's customer reviews?

Eco Solar Hawaii has a 4.7/5 rating based on 204 customer reviews. Customers consistently rate them highly.

How long has Eco Solar Hawaii been in business?

Eco Solar Hawaii was founded in 2008 and has been in business for 18 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Eco Solar Hawaii

Fill in your details and we'll connect you with Eco Solar Hawaii.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote