OS

OceanHead Solar & Electric

Women-owned solar and EV charging contractor serving residential and commercial clients on Oahu

Honolulu, Hawaii
4.7 (30 reviews)
Verified
Residential Commercial

8+

Years in Business

0

30

Customer Reviews

37 mi

Service Area

2-10

Employees

SurgePV Score

8.3 / 10
Customer Reviews
94%
Certifications
75%
Experience
85%
Services Range
90%
Warranty Coverage
63%
Online Presence
75%

About OceanHead Solar & Electric

OceanHead Solar & Electric is a women-owned electrical contracting company located at 220 Puuhale Road, Suite A5, in Honolulu. The company specializes in solar PV installations, EV charging station installations, and energy efficiency upgrades for both residential and commercial clients on Oahu. OceanHead ranks among the top solar installers on the EnergySage Marketplace for the Honolulu area.

The company offers full-service solar installations including system design, permitting, installation, and utility interconnection. OceanHead installs REC solar panels paired with Enphase and SolarEdge inverters, and offers Tesla Powerwall battery storage. Their EV charging services include home and commercial charger installations, making them a convenient choice for homeowners looking to combine solar and electric vehicle infrastructure in a single project.

OceanHead Solar & Electric holds a 4.7-star rating across review platforms. Customers frequently cite the company’s professionalism, clear communication, and clean installations. The company is BBB accredited and maintains a service-oriented approach, with a dedicated team that handles all paperwork and coordination with Hawaiian Electric (HECO) on behalf of customers.

Service Area

OceanHead Solar & Electric serves the following areas within a 37-mile radius:

HonoluluKailuaKaneohePearl CityAieaKapolei

Are you OceanHead Solar & Electric?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Solar Design
Grid Connection

Certifications & Accreditations

BBB Accredited Women-Owned Business

Partner Manufacturers

Panels

REC

Inverters

EnphaseSolarEdge

Batteries

Tesla Powerwall

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.7

30 reviews

Tyler R.

2 October 2025
Verified Customer

OceanHead installed solar and an EV charger at the same time. The team was organized and professional. Everything was done in two days and the system is performing perfectly.

Susan L.

18 July 2025
Verified Customer

As a fellow women-owned business, I was happy to support OceanHead. They delivered excellent work on our commercial rooftop system. Communication was outstanding throughout.

Mark J.

25 April 2025
Verified Customer

Good installation and reasonable pricing. The permitting process was handled entirely by their team, which saved me a lot of hassle. System has been running well for months.

Frequently Asked Questions About OceanHead Solar & Electric

What services does OceanHead Solar & Electric offer?

OceanHead Solar & Electric offers Solar Installation, Battery Storage, EV Charging, Solar Design, Grid Connection.

Is OceanHead Solar & Electric NABCEP certified?

OceanHead Solar & Electric holds the following certifications: BBB Accredited, Women-Owned Business. Contact them directly for the latest accreditation details.

What areas does OceanHead Solar & Electric serve?

OceanHead Solar & Electric serves Honolulu, Kailua, Kaneohe, Pearl City, Aiea, Kapolei. They are based in Honolulu with a service radius of 60 km.

What warranty does OceanHead Solar & Electric offer?

OceanHead Solar & Electric offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are OceanHead Solar & Electric's customer reviews?

OceanHead Solar & Electric has a 4.7/5 rating based on 30 customer reviews. Customers consistently rate them highly.

How long has OceanHead Solar & Electric been in business?

OceanHead Solar & Electric was founded in 2018 and has been in business for 8 years. They have solid experience in the solar industry.

Get a Free Solar Quote from OceanHead Solar & Electric

Fill in your details and we'll connect you with OceanHead Solar & Electric.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote