SE

Sunspear Energy

Full-service solar and battery storage company with over 22 megawatts installed across Hawaii

Honolulu, Hawaii
4.8 (20 reviews)
Verified
Residential Commercial

11+

Years in Business

0

20

Customer Reviews

50 mi

Service Area

11-50

Employees

SurgePV Score

8.8 / 10
Customer Reviews
96%
Certifications
90%
Experience
85%
Services Range
100%
Warranty Coverage
63%
Online Presence
75%

About Sunspear Energy

Sunspear Energy is a full-service solar and battery storage company headquartered at 345 N Nimitz Hwy, Suite A, in Honolulu. The company designs and installs solar PV systems for residential homeowners, commercial businesses, nonprofit organizations, and public sector clients across Oahu and the neighboring islands. With over 60,000 solar panels and more than 22 megawatts of solar capacity installed, Sunspear has built a track record as one of Hawaii’s more active local installers.

The company offers turnkey solar power system design, installation, and financing. Sunspear installs panels from REC and Hanwha Q Cells, paired with SolarEdge and Enphase inverters. For energy storage, they offer Tesla Powerwall and Enphase IQ Battery systems. The team holds NABCEP certification and is a SolarEdge Certified Installer, and the company maintains BBB accreditation.

Sunspear Energy holds a 4.8-star rating on Yelp from 20 reviews. Customers frequently mention the company’s clear communication, efficient installations, and willingness to explain system options without pressure. The company handles all permitting and utility interconnection paperwork on behalf of homeowners, which is particularly valuable given Hawaii’s interconnection requirements.

Service Area

Sunspear Energy serves the following areas within a 50-mile radius:

HonoluluKailuaKaneohePearl CityKapoleiEwa BeachWaipahu

Are you Sunspear Energy?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Energy Audit
Grid Connection
Monitoring

Certifications & Accreditations

BBB Accredited NABCEP Certified SolarEdge Certified Installer

Partner Manufacturers

Panels

RECHanwha Q Cells

Inverters

SolarEdgeEnphase

Batteries

Tesla PowerwallEnphase IQ Battery

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.8

20 reviews

Kimo T.

18 October 2025
Verified Customer

Sunspear made the whole solar process straightforward. They explained everything clearly during the consultation and the install crew was professional and efficient. Already seeing savings on my HECO bill.

Rachel S.

22 July 2025
Verified Customer

Great experience from start to finish. The team handled all the permitting and utility paperwork. Our system was up and running in about six weeks.

David K.

10 April 2025
Verified Customer

Solid installation and fair pricing. The only delay was on the utility side for the interconnection, but Sunspear kept us informed throughout the process.

Frequently Asked Questions About Sunspear Energy

What services does Sunspear Energy offer?

Sunspear Energy offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Grid Connection, Monitoring.

Is Sunspear Energy NABCEP certified?

Sunspear Energy holds the following certifications: BBB Accredited, NABCEP Certified, SolarEdge Certified Installer. Contact them directly for the latest accreditation details.

What areas does Sunspear Energy serve?

Sunspear Energy serves Honolulu, Kailua, Kaneohe, Pearl City, Kapolei, Ewa Beach, Waipahu. They are based in Honolulu with a service radius of 80 km.

What warranty does Sunspear Energy offer?

Sunspear Energy offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Sunspear Energy's customer reviews?

Sunspear Energy has a 4.8/5 rating based on 20 customer reviews. Customers consistently rate them highly.

How long has Sunspear Energy been in business?

Sunspear Energy was founded in 2015 and has been in business for 11 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Sunspear Energy

Fill in your details and we'll connect you with Sunspear Energy.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote