EDGE Energy
Vertically integrated Maryland electrification specialist with 5,000+ completed projects since 2006, serving DC, MD, and VA
20+
Years in Business
5,000+
Projects Completed
31
Customer Reviews
75 mi
Service Area
51-200
Employees
SurgePV Score
About EDGE Energy
EDGE Energy is a vertically integrated electrification company headquartered at 6854 Distribution Drive in Beltsville, Maryland, serving the Baltimore-Washington metropolitan area. Founded in 2006, the company has completed more than 5,000 projects across Maryland, Washington DC, and Virginia. EDGE Energy distinguishes itself as a whole-home electrification specialist, offering solar panel installation alongside heat pump HVAC systems, insulation, EV charging stations, and battery storage, all through in-house teams rather than subcontractors.
The company installs solar PV systems with Enphase microinverters and offers Tesla Powerwall battery storage for backup power. EDGE Energy’s vertically integrated model allows homeowners to address multiple energy efficiency improvements in a coordinated project, reducing costs and installation timelines. The company assists customers with available grants, rebates, and financing options for solar and other electrification upgrades.
With over 18 years in business and more than 5,000 completed projects, EDGE Energy holds an A+ BBB rating and NABCEP certification. Customers frequently cite the company’s whole-home approach as a key advantage, particularly for homeowners looking to combine solar with other energy efficiency improvements. The company offers free consultations and competitive pricing with transparent estimates.
Service Area
EDGE Energy serves the following areas within a 75-mile radius:
Contact Information
Are you EDGE Energy?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.5
31 reviews
Carlos R.
EDGE Energy handled our solar installation and heat pump replacement as a single project. Having one company manage both made the process much simpler. The solar system is performing well and our heating costs have dropped.
Maria L.
Professional team with competitive pricing. They walked us through the available grants and incentives before we signed. Installation was completed on time and the monitoring app works great.
Andrew K.
Good company for solar installation. They also evaluated our home for insulation and heat pump opportunities. The whole-home approach is a differentiator. System has been running smoothly for three months.
Frequently Asked Questions About EDGE Energy
What services does EDGE Energy offer?
EDGE Energy offers Solar Installation, Solar Design, Battery Storage, EV Charging, heat_pump, insulation, Maintenance.
Is EDGE Energy NABCEP certified?
Yes, EDGE Energy is NABCEP certified and also holds BBB Accredited certification. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does EDGE Energy serve?
EDGE Energy serves Baltimore, Beltsville, Columbia, Silver Spring, Rockville, Annapolis, Washington DC. They are based in Baltimore with a service radius of 120 km.
What warranty does EDGE Energy offer?
EDGE Energy offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are EDGE Energy's customer reviews?
EDGE Energy has a 4.5/5 rating based on 31 customer reviews. Customers consistently rate them highly.
How long has EDGE Energy been in business?
EDGE Energy was founded in 2006 and has been in business for 20 years. They are one of the more experienced solar installers in their area.
Similar Installers in Baltimore
Get a Free Solar Quote from EDGE Energy
Fill in your details and we'll connect you with EDGE Energy.
Quote request sent!
EDGE Energy will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile