LS

Lumina Solar

Mid-Atlantic's highest-rated solar installer with 6,000+ installations, headquartered in Baltimore and serving five states

Baltimore, Maryland
4.8 (900 reviews)
Verified
Residential Commercial

8+

Years in Business

6,000+

Projects Completed

900

Customer Reviews

124 mi

Service Area

51-200

Employees

SurgePV Score

8.6 / 10
Customer Reviews
96%
Certifications
60%
Experience
85%
Services Range
100%
Warranty Coverage
100%
Online Presence
75%

About Lumina Solar

Lumina Solar is a residential and commercial solar installation company headquartered at 3600 Commerce Drive, Suite 601 in Baltimore, Maryland. Founded in 2018, the company has rapidly grown to become one of the highest-rated solar providers in the Mid-Atlantic region, completing over 6,000 installations across Maryland, Pennsylvania, Virginia, Delaware, and Washington DC. Lumina’s founding and management team brings over 150 combined years of industry experience, and the company employs NABCEP-certified professionals.

Lumina Solar installs panels from REC and Qcells paired with Enphase microinverter or SolarEdge string inverter systems. Battery storage options include Tesla Powerwall and Enphase IQ Battery for homeowners seeking backup power. The company handles the complete project lifecycle including system design, engineering, permitting, installation, utility interconnection, and ongoing monitoring support. Lumina offers multiple financing options and assists customers with available state and local incentive applications.

With over 900 five-star reviews across platforms, Lumina Solar ranks among the top-rated solar installers in the Baltimore area. Customers consistently praise the company’s transparent pricing, quality equipment, and responsive communication from initial consultation through post-installation support. The company is open Monday through Saturday and offers free consultations for homeowners interested in evaluating solar for their property.

Service Area

Lumina Solar serves the following areas within a 124-mile radius:

BaltimoreColumbiaTowsonAnnapolisSilver SpringRockvilleFrederick

Are you Lumina Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Solar Design
Battery Storage
Maintenance
Monitoring
financing_assistance

Certifications & Accreditations

NABCEP

Partner Manufacturers

Panels

RECQcells

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallEnphase IQ Battery

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

25 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.8

900 reviews

Michael R.

5 November 2025
Verified Customer

Lumina Solar handled our installation from start to finish with zero issues. The design team optimized our panel layout for maximum production and the installation crew was professional and efficient. System has been running perfectly for three months.

Sarah L.

20 August 2025
Verified Customer

We compared five companies and Lumina offered the best combination of price, equipment, and warranty. The Enphase microinverters and monitoring app are great. Our electric bill has dropped by over 85 percent.

David K.

12 May 2025
Verified Customer

Good experience overall. The sales process was informative and the financing options were flexible. Installation took two days for our 11 kW system. Minor scheduling delay but Lumina communicated well throughout.

Frequently Asked Questions About Lumina Solar

What services does Lumina Solar offer?

Lumina Solar offers Solar Installation, Solar Design, Battery Storage, Maintenance, Monitoring, financing_assistance.

Is Lumina Solar NABCEP certified?

Yes, Lumina Solar is NABCEP certified. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does Lumina Solar serve?

Lumina Solar serves Baltimore, Columbia, Towson, Annapolis, Silver Spring, Rockville, Frederick. They are based in Baltimore with a service radius of 200 km.

What warranty does Lumina Solar offer?

Lumina Solar offers 25-year panel warranty, 25-year inverter warranty, and 25-year installation/workmanship warranty.

How are Lumina Solar's customer reviews?

Lumina Solar has a 4.8/5 rating based on 900 customer reviews. Customers consistently rate them highly.

How long has Lumina Solar been in business?

Lumina Solar was founded in 2018 and has been in business for 8 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Lumina Solar

Fill in your details and we'll connect you with Lumina Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote