PF

Power Factor

Family-owned Baltimore electrical contractor and solar installer with master electrician leadership and A+ BBB rating

Baltimore, Maryland
4.8 (30 reviews)
Verified
Residential Commercial

13+

Years in Business

0

30

Customer Reviews

50 mi

Service Area

2-10

Employees

SurgePV Score

8.3 / 10
Customer Reviews
96%
Certifications
75%
Experience
85%
Services Range
90%
Warranty Coverage
63%
Online Presence
75%

About Power Factor

Power Factor is a family-owned Baltimore-based electrical contractor specializing in solar energy systems, standby generators, and electrical services. Founded in 2013 by managing director George Lang, a licensed master electrician, the company operates from 8240 Beachwood Road in Baltimore. Power Factor’s electrical expertise distinguishes it from solar-only companies, as the team can handle electrical panel upgrades, wiring modifications, and other electrical work required for solar installations without subcontracting.

The company serves residential and commercial customers throughout the Baltimore metropolitan area, offering custom solar panel system design and installation alongside battery backup and generator systems. Power Factor works with more than 35 different panel manufacturer brands, allowing the team to recommend equipment tailored to each customer’s budget and performance requirements. The company also provides ongoing maintenance and service for installed systems.

Power Factor holds an A+ BBB rating and has been BBB-accredited since 2014. Customers consistently highlight the advantage of working with a master electrician-led company, citing the quality of electrical work and the direct, no-nonsense communication style. The company’s smaller size means customers work directly with the owner and lead technicians throughout the project.

Service Area

Power Factor serves the following areas within a 50-mile radius:

BaltimoreEssexDundalkTowsonCatonsvilleParkvillePerry Hall

Are you Power Factor?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Solar Design
Battery Storage
Maintenance
electrical_services

Certifications & Accreditations

Master Electrician BBB Accredited

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.8

30 reviews

Karen T.

15 September 2025
Verified Customer

Power Factor installed our solar system and it has been running flawlessly. George is a master electrician who knows what he is doing. When you call, you talk to a real person and get a straight answer.

James M.

28 June 2025
Verified Customer

Family-owned company that takes pride in their work. The solar installation was clean and professional. They also handled the electrical panel upgrade we needed. Fair pricing and honest communication.

Nancy P.

10 March 2025
Verified Customer

Good experience with Power Factor for our residential solar system. The master electrician background gives confidence in the quality of the electrical work. System has been producing as expected.

Frequently Asked Questions About Power Factor

What services does Power Factor offer?

Power Factor offers Solar Installation, Solar Design, Battery Storage, Maintenance, electrical_services.

Is Power Factor NABCEP certified?

Power Factor holds the following certifications: Master Electrician, BBB Accredited. Contact them directly for the latest accreditation details.

What areas does Power Factor serve?

Power Factor serves Baltimore, Essex, Dundalk, Towson, Catonsville, Parkville, Perry Hall. They are based in Baltimore with a service radius of 80 km.

What warranty does Power Factor offer?

Power Factor offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Power Factor's customer reviews?

Power Factor has a 4.8/5 rating based on 30 customer reviews. Customers consistently rate them highly.

How long has Power Factor been in business?

Power Factor was founded in 2013 and has been in business for 13 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Power Factor

Fill in your details and we'll connect you with Power Factor.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote