ElectriPros
BBB A+ rated Virginia Class A solar certified installer in Virginia Beach providing residential solar panel installation and electrical services
10+
Years in Business
10
Customer Reviews
50 mi
Service Area
2-10
Employees
SurgePV Score
About ElectriPros
ElectriPros LLC is a Virginia Class A solar certified installer based at 3419 Virginia Beach Boulevard, Suite 567 in Virginia Beach, Virginia. Founded in 2016, the company provides residential solar panel installation and electrical services across the Hampton Roads area. ElectriPros holds a BBB A+ rating and employs state licensed contractors for all solar and electrical work.
The company offers solar installation, system design, battery storage, and maintenance services. ElectriPros handles the complete installation process from initial assessment through permitting, installation, and system activation. As a licensed electrical contractor with solar certification, the company brings expertise in both electrical infrastructure and solar energy systems.
ElectriPros serves Virginia Beach, Norfolk, Chesapeake, Hampton, Newport News, and surrounding communities in southeastern Virginia.
Service Area
ElectriPros serves the following areas within a 50-mile radius:
Contact Information
Are you ElectriPros?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.5
10 reviews
Daniel F.
ElectriPros installed our solar system quickly and professionally. As state licensed contractors they clearly know their trade. The electrical work was clean and the system has been running perfectly.
Stephanie R.
Good experience from consultation to installation. The team was responsive and explained the process clearly. Our electric bill has been significantly reduced since the panels were activated.
Chris W.
Solid work by a knowledgeable team. They handled the design and installation efficiently. The only delay was waiting on the utility company for interconnection approval.
Frequently Asked Questions About ElectriPros
What services does ElectriPros offer?
ElectriPros offers Solar Installation, Solar Design, Battery Storage, Maintenance.
Is ElectriPros NABCEP certified?
ElectriPros holds the following certifications: BBB A+ Rating, Virginia Class A Solar Certified. Contact them directly for the latest accreditation details.
What areas does ElectriPros serve?
ElectriPros serves Virginia Beach, Norfolk, Chesapeake, Hampton, Newport News. They are based in Virginia Beach with a service radius of 80 km.
What warranty does ElectriPros offer?
ElectriPros offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are ElectriPros's customer reviews?
ElectriPros has a 4.5/5 rating based on 10 customer reviews. Customers consistently rate them highly.
How long has ElectriPros been in business?
ElectriPros was founded in 2016 and has been in business for 10 years. They are one of the more experienced solar installers in their area.
Similar Installers in Virginia Beach
Get a Free Solar Quote from ElectriPros
Fill in your details and we'll connect you with ElectriPros.
Quote request sent!
ElectriPros will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile