ES

Empowered Solar

Idaho solar specialists with a LEED-certified Professional Engineer designing custom residential and commercial systems in Boise

Boise, Idaho
5 (8 reviews)
Verified
Residential Commercial

8+

Years in Business

0

8

Customer Reviews

62 mi

Service Area

1-10

Employees

SurgePV Score

9 / 10
Customer Reviews
100%
Certifications
75%
Experience
85%
Services Range
100%
Warranty Coverage
80%
Online Presence
100%

About Empowered Solar

Empowered Solar is an Idaho-based solar company located at 1407 E. Jefferson Street in Boise, ID 83712. The company specializes in designing and installing solar electric systems for residential and commercial customers throughout the Treasure Valley. One of the founders, Tyler, is a LEED-certified Professional Engineer with an extensive electrical engineering background, bringing technical rigor to every system design.

Empowered Solar provides both roof-mounted and ground-mounted solar panel installations using high-quality panels, inverters, mounting systems, and other components backed by industry-leading warranties. The company works with Enphase and SolarEdge inverter systems and offers battery storage options for energy independence.

Empowered Solar holds a BuildZoom score of 105, ranking in the top 8% of 53,194 Idaho licensed contractors. The company maintains a 5.0-star rating from customer reviews, with homeowners consistently praising the engineering expertise, honest recommendations, and quality installations. Empowered Solar offers free site assessments and consultations for homeowners considering solar.

Service Area

Empowered Solar serves the following areas within a 62-mile radius:

BoiseMeridianEagleNampaCaldwellKuna

Are you Empowered Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Energy Audit
Grid Connection
Maintenance

Certifications & Accreditations

LEED Certified Licensed Idaho Contractor

Partner Manufacturers

Panels

Tier-1 Solar Panels

Inverters

EnphaseSolarEdge

Batteries

Battery Storage

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

5

8 reviews

Andrew S.

28 July 2025
Verified Customer

Empowered Solar designed a system that maximizes our south-facing roof. Tyler's engineering background gives you confidence that the design is optimized. Production has exceeded estimates every month.

Megan R.

16 May 2025
Verified Customer

We chose Empowered Solar because Tyler is a licensed Professional Engineer. The attention to detail in the system design was noticeable. Installation was clean and professional.

Nathan B.

2 March 2025
Verified Customer

Great local company. Empowered Solar provided a thorough site assessment and honest recommendation on system size. They did not try to oversell us. The installation went smoothly and the system works perfectly.

Frequently Asked Questions About Empowered Solar

What services does Empowered Solar offer?

Empowered Solar offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Grid Connection, Maintenance.

Is Empowered Solar NABCEP certified?

Empowered Solar holds the following certifications: LEED Certified, Licensed Idaho Contractor. Contact them directly for the latest accreditation details.

What areas does Empowered Solar serve?

Empowered Solar serves Boise, Meridian, Eagle, Nampa, Caldwell, Kuna. They are based in Boise with a service radius of 100 km.

What warranty does Empowered Solar offer?

Empowered Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Empowered Solar's customer reviews?

Empowered Solar has a 5/5 rating based on 8 customer reviews. Customers consistently rate them highly.

How long has Empowered Solar been in business?

Empowered Solar was founded in 2018 and has been in business for 8 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Empowered Solar

Fill in your details and we'll connect you with Empowered Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote