Idahome Energy
Locally owned Boise solar installer founded to fill Idaho's need for a trustworthy, community-focused solar company since 2018
8+
Years in Business
286
Customer Reviews
93 mi
Service Area
11-50
Employees
SurgePV Score
About Idahome Energy
Idahome Energy is a locally owned and operated solar installation company founded in 2018 by Tyler Grange, a Utah State University graduate with a degree in Business Administration and Marketing. The company is headquartered at 6149 N Meeker Place, Suite 110 in Boise, ID 83713, and was established to fill a need for a trustworthy, community-focused solar provider in Idaho. Idahome Energy has grown from a small startup into one of the most reviewed solar companies in the state.
The company specializes in residential solar PV installations using Silfab panels with APsystems microinverters, along with solar battery storage and EV charging station installation. Idahome Energy is BBB-accredited with an A+ rating and was recognized as a 2023 APsystems award winner for their innovative flag-roof solar project. The company also provides roofing services, electrical panel upgrades, and solar system repair and maintenance.
Idahome Energy has accumulated 286 reviews with a 4.8-star average rating, making it one of the most highly reviewed solar companies in Idaho. Customers consistently praise the knowledgeable, pressure-free consultation process and the professionalism of the installation crews. The company serves customers throughout southern Idaho including Boise, Meridian, Eagle, Nampa, Emmett, and Twin Falls.
Service Area
Idahome Energy serves the following areas within a 93-mile radius:
Contact Information
Are you Idahome Energy?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.8
286 reviews
Lou E.
Idahome Energy provided a pressure-free consultation with comprehensive explanations of our solar options. The installation crew was professional and the system has been working great since day one.
Josh H.
Tyler and his team made going solar easy. They handled everything from design to permitting to installation. Our energy bills have dropped significantly and the monitoring app is easy to use.
Maria S.
Good local company that clearly cares about their customers. The installation was completed on schedule and the system is performing as projected. Would recommend Idahome Energy to anyone in the Treasure Valley.
Frequently Asked Questions About Idahome Energy
What services does Idahome Energy offer?
Idahome Energy offers Solar Installation, Battery Storage, Solar Design, EV Charging, Maintenance, Monitoring, Roof Assessment.
Is Idahome Energy NABCEP certified?
Idahome Energy holds the following certifications: BBB Accredited, Licensed Idaho Contractor, APsystems Certified. Contact them directly for the latest accreditation details.
What areas does Idahome Energy serve?
Idahome Energy serves Boise, Meridian, Eagle, Nampa, Caldwell, Emmett, Twin Falls. They are based in Boise with a service radius of 150 km.
What warranty does Idahome Energy offer?
Idahome Energy offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Idahome Energy's customer reviews?
Idahome Energy has a 4.8/5 rating based on 286 customer reviews. Customers consistently rate them highly.
How long has Idahome Energy been in business?
Idahome Energy was founded in 2018 and has been in business for 8 years. They have solid experience in the solar industry.
Similar Installers in Boise
Get a Free Solar Quote from Idahome Energy
Fill in your details and we'll connect you with Idahome Energy.
Quote request sent!
Idahome Energy will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile