Powered Alliance Solar
Family-owned Boise solar provider with NABCEP certification and over 2,500 successful installations across residential, commercial, and farm projects
9+
Years in Business
2,500+
Projects Completed
55
Customer Reviews
124 mi
Service Area
11-50
Employees
SurgePV Score
About Powered Alliance Solar
Powered Alliance Solar is a family-owned and operated solar provider founded in 2017 and headquartered at 3350 W Americana Terrace, Suite 100 in Boise, ID 83706. The company has completed over 2,500 successful residential, commercial, and farm solar installations across Idaho, Oregon, Utah, and Arizona. All work is performed 100% in-house with no subcontractors.
The company is NABCEP-certified and employs engineers who create completely customized solar systems for each customer, selecting the most energy-efficient panels for each property’s specific conditions. Powered Alliance provides full-service solar solutions including system design, engineering coordination, permitting support, equipment procurement, installation management, and post-installation monitoring and support.
Powered Alliance Solar has earned a 4.8-star rating from 55 Google reviews, with customers praising the customized system designs and professional installation quality. The company is open Monday through Friday from 10:00 AM to 4:00 PM and offers free consultations. Powered Alliance has grown from its Boise roots into a provider serving thousands of customers across multiple states.
Service Area
Powered Alliance Solar serves the following areas within a 124-mile radius:
Contact Information
Are you Powered Alliance Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.8
55 reviews
Ryan M.
Powered Alliance designed a completely customized system for our home. Their engineers took the time to understand our energy usage and created an optimal layout. Installation was professional and efficient.
Christina B.
We appreciated that Powered Alliance handles everything 100% in-house. No subcontractors. The quality shows in the finished product. Our system has been producing above estimates since it went live.
James T.
Good experience overall with our farm solar installation. Powered Alliance handled the permitting and design well. The system is large and required careful planning, which they delivered on.
Frequently Asked Questions About Powered Alliance Solar
What services does Powered Alliance Solar offer?
Powered Alliance Solar offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Grid Connection, Maintenance, Monitoring.
Is Powered Alliance Solar NABCEP certified?
Yes, Powered Alliance Solar is NABCEP certified and also holds Licensed Idaho Contractor certification. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does Powered Alliance Solar serve?
Powered Alliance Solar serves Boise, Meridian, Nampa, Eagle, Caldwell, Twin Falls, Idaho Falls. They are based in Boise with a service radius of 200 km.
What warranty does Powered Alliance Solar offer?
Powered Alliance Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Powered Alliance Solar's customer reviews?
Powered Alliance Solar has a 4.8/5 rating based on 55 customer reviews. Customers consistently rate them highly.
How long has Powered Alliance Solar been in business?
Powered Alliance Solar was founded in 2017 and has been in business for 9 years. They have solid experience in the solar industry.
Similar Installers in Boise
Get a Free Solar Quote from Powered Alliance Solar
Fill in your details and we'll connect you with Powered Alliance Solar.
Quote request sent!
Powered Alliance Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile