E

Energy-tec

Award-winning Salisbury-based renewable energy specialists with 30 years combined experience

Salisbury, UK
0 (0 reviews)
Verified
Residential Commercial

13+

Years in Business

0

50 km

Service Area

1-10

Employees

SurgePV Score

5.4 / 10
Customer Reviews
0%
Certifications
60%
Experience
85%
Services Range
90%
Warranty Coverage
63%
Online Presence
50%

About Energy-tec

Energy-tec is a Salisbury-based renewable energy company founded in 2013 by directors Olly and Steve, who bring a combined 30 years of experience in domestic and commercial plumbing, heating, electrical, and energy management. The company can be reached on 01722 334826 or at [email protected].

Energy-tec installs Solar PV, Solar Thermal, Air Source, Ground Source, and Water Source Heat Pumps for residential and commercial customers across Salisbury, Andover, Amesbury, Shaftesbury, and Blandford Forum. The company is fully accredited to work with multiple renewable and heating technologies, and holds relevant qualifications for all technology types it installs.

Energy-tec is an award-winning business with a broad renewable energy portfolio. The combination of solar PV and heat pump capability means the company can deliver whole-house energy strategies for customers looking to reduce reliance on grid electricity and gas. Energy-tec is listed on the Renewables Excellence installer directory for Salisbury.

Service Area

Energy-tec serves the following areas within a 50 km radius:

SalisburyAndoverAmesburyShaftesburyBlandford ForumWinchester

Are you Energy-tec?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance
Energy Audit

Certifications & Accreditations

MCS

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

No reviews yet.

Frequently Asked Questions About Energy-tec

What services does Energy-tec offer?

Energy-tec offers Solar Installation, Battery Storage, Maintenance, Energy Audit.

Is Energy-tec MCS certified?

Yes, Energy-tec is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Energy-tec serve?

Energy-tec serves Salisbury, Andover, Amesbury, Shaftesbury, Blandford Forum, Winchester. They are based in Salisbury with a service radius of 50 km.

What warranty does Energy-tec offer?

Energy-tec offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Energy-tec's customer reviews?

Energy-tec does not have any reviews yet. Be the first to leave a review after using their services.

How long has Energy-tec been in business?

Energy-tec was founded in 2013 and has been in business for 13 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Energy-tec

Fill in your details and we'll connect you with Energy-tec.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote