ES

ESE Solar

Nationally operating MCS solar installer founded 2015 with 4.7-star Trustpilot rating

York, UK
4.7 (2800 reviews)
Verified
Residential Commercial

11+

Years in Business

14,000+

Projects Completed

2,800

Customer Reviews

100 km

Service Area

51-200

Employees

SurgePV Score

7.3 / 10
Customer Reviews
94%
Certifications
60%
Experience
85%
Services Range
75%
Warranty Coverage
63%
Online Presence
25%

About ESE Solar

ESE Solar (part of ESE Group) was founded in 2015 and operates from Independence House, Millfield Lane, Nether Poppleton, York, YO26 6PH. The company has grown to serve more than 14,000 customers across the UK and holds a 4.7-star rating on Trustpilot from over 2,800 reviews — one of the largest review volumes among UK solar installers.

ESE Solar offers residential solar PV installations and battery storage, covering York and a wide national footprint. Standard residential systems include up to 20 400-watt panels, with battery storage available from leading brands. The company also offers a 15-year complimentary maintenance package and insurance-backed guarantees, which provide longer-term protection beyond the standard manufacturer warranties.

The company holds MCS certification. A small number of customer reviews have raised concerns about documentation delays after installation, specifically around MCS certificates and SEG paperwork. Prospective customers are advised to confirm certificate timelines before signing contracts.

The York office location at Nether Poppleton places ESE Solar within easy reach of the city centre, and the team covers the wider Yorkshire region. With over 6,000 Trustpilot reviews across the ESE Group and a strong track record of installations, ESE Solar is one of the higher-volume solar installation businesses operating in the York market.

Service Area

ESE Solar serves the following areas within a 100 km radius:

YorkLeedsSheffieldNewcastleHarrogateHull

Are you ESE Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance

Certifications & Accreditations

MCS

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

4.7

2800 reviews

Verified Trustpilot Customer

10 October 2024
Verified Customer

Professional service from start to finish. The installation team were friendly, efficient and cleaned up thoroughly after themselves.

Verified Trustpilot Customer

5 August 2024
Verified Customer

Great communication throughout the process and a quick turnaround from survey to install. Very happy with our new solar and battery setup.

Frequently Asked Questions About ESE Solar

What services does ESE Solar offer?

ESE Solar offers Solar Installation, Battery Storage, Maintenance.

Is ESE Solar MCS certified?

Yes, ESE Solar is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does ESE Solar serve?

ESE Solar serves York, Leeds, Sheffield, Newcastle, Harrogate, Hull. They are based in York with a service radius of 100 km.

What warranty does ESE Solar offer?

ESE Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are ESE Solar's customer reviews?

ESE Solar has a 4.7/5 rating based on 2800 customer reviews. Customers consistently rate them highly.

How long has ESE Solar been in business?

ESE Solar was founded in 2015 and has been in business for 11 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from ESE Solar

Fill in your details and we'll connect you with ESE Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote