EE

Ethical Energy Solar

Pennsylvania solar installer helping thousands of homeowners go solar with personalized service and US-made components

Pittsburgh, Pennsylvania
4.5 (30 reviews)
Verified
Residential

6+

Years in Business

0

30

Customer Reviews

93 mi

Service Area

11-50

Employees

SurgePV Score

8.2 / 10
Customer Reviews
90%
Certifications
60%
Experience
70%
Services Range
100%
Warranty Coverage
80%
Online Presence
100%

About Ethical Energy Solar

Ethical Energy Solar is a locally owned and operated solar installation company established in 2020, serving homeowners across Pennsylvania, Maryland, and Delaware. The company maintains a Pittsburgh office at 6 Commerce Drive, Pittsburgh, PA 15239, and has helped thousands of homeowners qualify for solar panel installations. Ethical Energy has built a reputation for personalized service and thorough customer education throughout the entire process.

The company specializes in residential solar installations using US-made panels and durable components. Every system is thoroughly tested before handoff, from the solar panels to the inverter and monitoring systems, to ensure optimal performance. Ethical Energy Solar focuses on tailored system design rather than one-size-fits-all solutions, working with each homeowner to determine the right system size and configuration for their specific energy needs and roof characteristics.

Ethical Energy Solar maintains a 4.5-star rating across review platforms with more than 30 reviews. Customers frequently praise the company’s transparency, educational approach, and commitment to quality installations. The company offers free consultations and assists with all permitting and utility interconnection paperwork.

Service Area

Ethical Energy Solar serves the following areas within a 93-mile radius:

PittsburghPlumMonroevilleMurrysvilleIrwinGreensburgYork

Are you Ethical Energy Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Energy Audit
Grid Connection
Monitoring

Certifications & Accreditations

NABCEP

Partner Manufacturers

Panels

US-Made Solar Panels

Inverters

Enphase

Batteries

Enphase IQ Battery

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.5

30 reviews

Jennifer H.

20 August 2025
Verified Customer

Ethical Energy made the entire process straightforward. They use US-made parts and durable materials, and the installation crew was polite and professional. Our energy bill has dropped significantly.

Steven B.

14 May 2025
Verified Customer

From the first consultation to the final inspection, Ethical Energy was transparent about costs and timeline. They tested everything from the panels to the inverter before leaving. Great experience.

Angela M.

28 February 2025
Verified Customer

Good company with solid customer education. They explained how our system works and set up the monitoring app before they left. The permitting process took a bit longer than quoted but the end result is excellent.

Frequently Asked Questions About Ethical Energy Solar

What services does Ethical Energy Solar offer?

Ethical Energy Solar offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Grid Connection, Monitoring.

Is Ethical Energy Solar NABCEP certified?

Yes, Ethical Energy Solar is NABCEP certified. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does Ethical Energy Solar serve?

Ethical Energy Solar serves Pittsburgh, Plum, Monroeville, Murrysville, Irwin, Greensburg, York. They are based in Pittsburgh with a service radius of 150 km.

What warranty does Ethical Energy Solar offer?

Ethical Energy Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Ethical Energy Solar's customer reviews?

Ethical Energy Solar has a 4.5/5 rating based on 30 customer reviews. Customers consistently rate them highly.

How long has Ethical Energy Solar been in business?

Ethical Energy Solar was founded in 2020 and has been in business for 6 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Ethical Energy Solar

Fill in your details and we'll connect you with Ethical Energy Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote