ES

EverGuard Solar

Family-owned Albuquerque solar and roofing company with BBB A+ accreditation since 2018

Albuquerque, New Mexico
4.8 (16 reviews)
Verified
Residential Commercial

18+

Years in Business

0

16

Customer Reviews

75 mi

Service Area

11-50

Employees

SurgePV Score

8.8 / 10
Customer Reviews
96%
Certifications
60%
Experience
100%
Services Range
90%
Warranty Coverage
80%
Online Presence
100%

About EverGuard Solar

EverGuard Solar is a locally and family-owned solar installation company founded in 2008 in Albuquerque, New Mexico. Operating from 220 Menaul Blvd NE, the company serves residential and commercial customers across the greater Albuquerque area, Santa Fe, Rio Rancho, Los Lunas, and surrounding communities. EverGuard combines solar panel installation with roofing services, allowing homeowners to address both needs in a single project.

The company has held BBB A+ accreditation since 2018 and has built a 16-year track record of reliable solar installations in New Mexico. EverGuard handles every phase of the installation process in-house, from initial roof assessment and system design through permitting, construction, and post-installation monitoring. Their dual expertise in roofing and solar means they can evaluate roof condition and make necessary repairs before installing panels, reducing the risk of future issues.

EverGuard Solar maintains a strong reputation across review platforms with a 4.8-star average. Customers consistently highlight the company’s personalized service, clean installations, and transparent communication throughout the project. The family-owned structure means customers often work directly with company principals, which contributes to their high satisfaction scores. EverGuard offers 25-year manufacturer warranties on panels and inverters alongside a 10-year workmanship warranty.

Service Area

EverGuard Solar serves the following areas within a 75-mile radius:

AlbuquerqueSanta FeRio RanchoLos LunasBelenPlacitasCorralesEdgewood

Are you EverGuard Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance
Roof Assessment

Certifications & Accreditations

BBB A+ Accredited

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.8

16 reviews

Karen L.

18 September 2025
Verified Customer

EverGuard Solar replaced our aging roof and installed solar panels in a single coordinated project. The family-owned feel of the company shows in how attentive they are. Great experience from consultation to final inspection.

Paul D.

2 June 2025
Verified Customer

We had EverGuard install a 7 kW system on our Albuquerque home. The crew was respectful, efficient, and left our property spotless. Our electric bills have dropped to almost nothing. Highly recommend.

Lisa M.

25 January 2025
Verified Customer

Good company with fair pricing. The installation was completed professionally and on schedule. The team was helpful in explaining how the system works and how to monitor production. Solid local option.

Frequently Asked Questions About EverGuard Solar

What services does EverGuard Solar offer?

EverGuard Solar offers Solar Installation, Battery Storage, Maintenance, Roof Assessment.

Is EverGuard Solar NABCEP certified?

EverGuard Solar holds the following certifications: BBB A+ Accredited. Contact them directly for the latest accreditation details.

What areas does EverGuard Solar serve?

EverGuard Solar serves Albuquerque, Santa Fe, Rio Rancho, Los Lunas, Belen, Placitas, Corrales, Edgewood. They are based in Albuquerque with a service radius of 120 km.

What warranty does EverGuard Solar offer?

EverGuard Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are EverGuard Solar's customer reviews?

EverGuard Solar has a 4.8/5 rating based on 16 customer reviews. Customers consistently rate them highly.

How long has EverGuard Solar been in business?

EverGuard Solar was founded in 2008 and has been in business for 18 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from EverGuard Solar

Fill in your details and we'll connect you with EverGuard Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote