Solar Installers in Albuquerque, New Mexico

10 Companies 615 Reviews 4.6 Avg
All ResidentialCommercialIndustrial

Top Solar Installers in Albuquerque

Ranked by rating and customer reviews

SS
1

SunState Solar

Verified
5.0 (26 reviews)
Est. 2018 · Albuquerque, New Mexico · 25yr warranty
SolarBatteryMaintenanceMonitoring

BBB A+ Accredited

PE
2

Positive Energy Solar

Verified
4.9 (300 reviews)
Est. 1997 · Albuquerque, New Mexico · 25yr warranty
SolarBatteryEV ChargingMaintenance

NABCEP · B-Corp Certified · SunPower Master Dealer

SunPower + Enphase

ES
3

EverGuard Solar

Verified
4.8 (16 reviews)
Est. 2008 · Albuquerque, New Mexico · 25yr warranty
SolarBatteryMaintenanceRoof Assessment

BBB A+ Accredited

PS
4

Poulin Solar Pro

Verified
4.7 (65 reviews)
Est. 2015 · Albuquerque, New Mexico · 25yr warranty
SolarBatteryMaintenanceMonitoring

BBB A+ Accredited · Authorized Enphase Installer

QCell + Enphase

SM
5

Sandia Mountain Solar

Verified
4.7 (17 reviews)
Est. 2017 · Albuquerque, New Mexico · 25yr warranty
SolarBatteryMaintenanceMonitoring

NM Licensed Contractor

SL
6

Sol Luna Solar

Verified
4.6 (40 reviews)
Est. 1991 · Albuquerque, New Mexico · 25yr warranty
SolarBatteryCommercialMaintenance

NABCEP · BBB A+ Rated

OS
7

OE Solar

Verified
4.5 (38 reviews)
Est. 2009 · Albuquerque, New Mexico · 25yr warranty
SolarBatteryEV ChargingMaintenance

NABCEP · BBB A+ Accredited · Tesla Certified Installer

PS
8

PPC Solar

Verified
4.5 (20 reviews)
Est. 1979 · Albuquerque, New Mexico · 25yr warranty
SolarBatteryEV ChargingMaintenance

NABCEP

AS
9

Affordable Solar

Verified
4.2 (29 reviews)
Est. 1998 · Albuquerque, New Mexico · 25yr warranty
SolarBatteryCommercialMaintenance

NABCEP · BBB A+ Accredited

MS
10

Meraki Solar NM

Verified
4.0 (64 reviews)
Est. 2017 · Albuquerque, New Mexico · 25yr warranty
SolarBatteryMaintenanceMonitoring

NABCEP

What Solar Costs in Albuquerque

$2.50-$3.50

Cost per Watt

$20,000-$28,000

Typical 8kW System

8-12 yrs

Payback Period

$1,400-$2,400

Annual Savings (8kW)

Based on national averages. The 30% federal residential tax credit expired Dec 31, 2025. State and local incentives may reduce your net cost. Get quotes from multiple installers for accurate pricing.

How We Rank Solar Installers

Our rankings combine verified customer reviews, certification status, years of experience, service range, and warranty coverage into a single SurgePV Score.

Customer Reviews

We aggregate ratings from Google, Yelp, BBB, and SolarReviews.

Certifications

NABCEP certification is the US gold standard. We also check state licensing and manufacturer certifications.

Track Record

Years in business, projects completed, and warranty coverage contribute to the overall score.

Why Trust the SurgePV Directory?

Every company listed here has been independently researched and verified. We check certifications, aggregate reviews from multiple platforms, and verify that every business is actively trading. Companies cannot pay to improve their ranking.

10

Verified Companies

615

Customer Reviews

Solar Installation in Albuquerque, New Mexico

Albuquerque homeowners are investing in solar to reduce electricity bills and increase property value. A typical residential system generates 9,600-14,400 kWh per year, offsetting 80-100% of household electricity use depending on system size and roof orientation.

How to Choose an Installer in Albuquerque

Start by checking NABCEP certification and New Mexico state contractor licensing. Get at least three written quotes that include equipment specifications, total cost, expected annual production, and warranty terms. Compare not just price, but also equipment quality, warranty length, and the company's track record in Albuquerque.

What to Expect

The process from signing a contract to turning on your system takes 6-12 weeks. Your installer handles design, permitting, installation (1-3 days), inspection, and utility interconnection. Once the utility grants Permission to Operate (PTO), your system goes live and starts generating savings.

More Cities in New Mexico

Find solar installers in other New Mexico cities

For Solar Installers

Design Faster. Sell More.

SurgePV is the solar design platform used by installers across the US. Cut design time by 60%, generate professional proposals in minutes, and close more deals.

Solar Installation: Step by Step

1

Free Consultation

Contact an installer for a free site assessment. They'll evaluate your roof, shading, and energy usage.

2

Design & Quote

Receive a detailed proposal with system size, costs, available state incentives, and projected returns.

3

Permitting

Your installer handles building permits, HOA approvals, and utility interconnection applications.

4

Installation

Panels, inverter, and wiring are installed in 1-3 days. Followed by city inspection.

5

Permission to Operate

Utility grants PTO, system goes live, and you start generating clean energy.

Frequently Asked Questions

How much do solar panels cost in Albuquerque?

Solar panel costs in Albuquerque typically range from $2.50-$3.50 per watt. A standard 8kW residential system costs $20,000-$28,000. The 30% federal residential tax credit expired on December 31, 2025, so this is the full out-of-pocket cost. New Mexico state and local incentives, net metering, and SRECs may help reduce your net cost.

Who is the best solar installer in Albuquerque?

The best solar installer in Albuquerque depends on your needs, budget, and project type. Check ratings, reviews, certifications (NABCEP), and experience on this page. Get quotes from at least three installers to compare.

How long does solar installation take?

Physical installation takes 1-3 days. The full process from contract to Permission to Operate typically takes 6-12 weeks, including design, permitting, installation, inspection, and utility interconnection.

Do I need permits for solar panels?

Yes. Solar installations require building and electrical permits. Your installer handles all permitting, including HOA approval and utility interconnection. Some jurisdictions use SolarAPP+ for same-day automated approvals.

What solar incentives are available in Albuquerque?

The 30% federal residential clean energy tax credit (ITC) expired on December 31, 2025. However, New Mexico may offer state-level incentives such as rebates, performance-based incentives, or solar renewable energy certificates (SRECs). Net metering policies vary by utility — check with your local utility in Albuquerque to see if they offer full retail credit for exported solar power. Your installer should walk you through all available incentives during the quoting process.

How much can I save with solar panels in Albuquerque?

Savings depend on your electricity rate, system size, and sun exposure. A typical 8kW system offsets $1,400-$2,400 per year in electricity costs. Over 25 years, total savings typically range from $25,000-$50,000. Your installer can provide a detailed savings estimate based on your specific utility rate and energy usage.

Should I get battery storage with my solar panels?

Battery storage ($12,000-$18,000 installed) is worth considering if you have time-of-use electricity rates, experience frequent power outages, or want energy independence. Without favorable net metering, batteries help you use more of your own solar power instead of exporting it at lower rates. Popular options include Tesla Powerwall, Enphase IQ Battery, and Franklin WH.

What equipment should I look for?

Top-tier solar panels include REC, Q Cells, Canadian Solar, and Silfab. For inverters, Enphase microinverters (25-year warranty) and SolarEdge optimizers are the most popular. Your installer should offer multiple equipment options at different price points and explain the trade-offs.

Are You a Solar Installer in Albuquerque?

List your company for free and connect with local customers looking for solar installation services.

List Your Company Free