HE

Helios Energy Global

Santa Monica-based solar and battery storage installer serving Long Beach and greater Los Angeles with 5-star rating

Long Beach, California
5 (28 reviews)
Residential

7+

Years in Business

0

28

Customer Reviews

50 mi

Service Area

1-10

Employees

SurgePV Score

6.4 / 10
Customer Reviews
100%
Certifications
0%
Experience
70%
Services Range
75%
Warranty Coverage
63%
Online Presence
75%

About Helios Energy Global

Helios Energy Global is a solar installation company based at 2226 6th Street A in Santa Monica, California, serving Long Beach and the greater Los Angeles area. The company provides residential solar panel installations with battery storage solutions for homeowners across LA County.

Helios Energy Global focuses on designing solar systems that maximize energy production and include battery storage for backup power and energy independence. The company handles all aspects of the installation process from consultation and design through permitting and utility interconnection.

The company has earned a 5.0-star rating on EcoWatch with 28 reviews on Yelp, and serves a wide area across Los Angeles County including Long Beach, Santa Monica, Torrance, Carson, and surrounding communities.

Service Area

Helios Energy Global serves the following areas within a 50-mile radius:

Long BeachSanta MonicaLos AngelesTorranceCarsonCulver City

Are you Helios Energy Global?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

5

28 reviews

Daniel R.

10 August 2025
Verified Customer

Helios Energy Global installed our solar panels and battery storage in Long Beach. The system works perfectly and we have backup power during outages.

Sarah J.

22 May 2025
Verified Customer

Excellent service from start to finish. They designed a system that maximizes our roof space and the battery storage integration was seamless.

Michael W.

15 February 2025
Verified Customer

Great local company with competitive pricing. The installation was professional and our energy bills have dropped significantly since going solar.

Frequently Asked Questions About Helios Energy Global

What services does Helios Energy Global offer?

Helios Energy Global offers Solar Installation, Battery Storage, Solar Design.

Is Helios Energy Global NABCEP certified?

Helios Energy Global holds the following certifications: None listed. Contact them directly for the latest accreditation details.

What areas does Helios Energy Global serve?

Helios Energy Global serves Long Beach, Santa Monica, Los Angeles, Torrance, Carson, Culver City. They are based in Long Beach with a service radius of 80 km.

What warranty does Helios Energy Global offer?

Helios Energy Global offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Helios Energy Global's customer reviews?

Helios Energy Global has a 5/5 rating based on 28 customer reviews. Customers consistently rate them highly.

How long has Helios Energy Global been in business?

Helios Energy Global was founded in 2019 and has been in business for 7 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Helios Energy Global

Fill in your details and we'll connect you with Helios Energy Global.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote