F

Feazel

Award-winning roofing and solar company with 35+ years of experience

Cincinnati, Ohio
4.7 (22 reviews)
Verified
Residential Commercial

38+

Years in Business

0

22

Customer Reviews

62 mi

Service Area

201-500

Employees

SurgePV Score

9.3 / 10
Customer Reviews
94%
Certifications
100%
Experience
100%
Services Range
60%
Warranty Coverage
100%
Online Presence
100%

About Feazel

Feazel is an award-winning roofing and exterior services company with a Cincinnati office at 11550 Enterprise Park Drive, Cincinnati, OH 45241. Founded in 1988, Feazel has expanded from roofing into solar installations, leveraging over 35 years of roofing expertise.

The company is a GAF Master Elite Contractor and offers both traditional rack-mount solar panels and GAF Timberline Solar Shingles. Feazel holds NABCEP certification and maintains an A+ BBB rating. Their licensed and factory-trained professionals provide solar installations backed by a 25-year workmanship warranty.

Feazel operates offices in Cincinnati, Columbus, Cleveland, Dayton, and Raleigh, NC, serving residential and commercial customers with integrated roofing and solar solutions.

Service Area

Feazel serves the following areas within a 62-mile radius:

CincinnatiLovelandMasonWest ChesterHamilton

Are you Feazel?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Maintenance

Certifications & Accreditations

GAF Master Elite Contractor NABCEP Certified BBB A+ GAF Certified Green Roofer

Partner Manufacturers

Panels

GAF Timberline Solar

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

25 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.7

22 reviews

Verified Customer

28 September 2025
Verified Customer

Feazel installed GAF solar shingles on our new roof and the result looks incredible. Their roofing expertise translates perfectly to solar installations.

Verified Customer

14 June 2025
Verified Customer

We went with Feazel because of their 35 years of roofing experience. The solar panel installation was professionally done with a 25-year workmanship warranty.

Verified Customer

20 March 2025
Verified Customer

Quality installation and good communication throughout. Feazel's roofing background gives them a unique advantage when it comes to solar panel placement and roof integrity.

Frequently Asked Questions About Feazel

What services does Feazel offer?

Feazel offers Solar Installation, Maintenance.

Is Feazel NABCEP certified?

Feazel holds the following certifications: GAF Master Elite Contractor, NABCEP Certified, BBB A+, GAF Certified Green Roofer. Contact them directly for the latest accreditation details.

What areas does Feazel serve?

Feazel serves Cincinnati, Loveland, Mason, West Chester, Hamilton. They are based in Cincinnati with a service radius of 100 km.

What warranty does Feazel offer?

Feazel offers 25-year panel warranty, 25-year inverter warranty, and 25-year installation/workmanship warranty.

How are Feazel's customer reviews?

Feazel has a 4.7/5 rating based on 22 customer reviews. Customers consistently rate them highly.

How long has Feazel been in business?

Feazel was founded in 1988 and has been in business for 38 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Feazel

Fill in your details and we'll connect you with Feazel.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote