Vespa Solar
Locally owned Columbus solar and home improvement company with 30-year panel and inverter warranties
5+
Years in Business
10
Customer Reviews
93 mi
Service Area
2-10
Employees
SurgePV Score
About Vespa Solar
Vespa Solar is a locally owned solar energy and home improvement company serving the Columbus, Ohio area. Founded in 2021, the company operates offices in Upper Arlington and maintains a warehouse in Tallmadge, Ohio. Vespa Solar provides residential solar installations throughout the entire state of Ohio, with a focus on personalized service and competitive pricing.
The company offers end-to-end residential solar services including site assessment, custom system design, permitting, professional installation, and post-installation monitoring. Vespa Solar stands out by offering a 30-year warranty on both solar panels and inverters, the longest coverage period available in the Columbus market. This warranty remains valid even if the original equipment manufacturer becomes insolvent or goes out of business.
Vespa Solar holds a perfect 5.0-star rating from customer reviews, with homeowners praising Scott and his team for professionalism, clear communication, and affordability compared to larger competitors. The company’s BBB-accredited profile and local focus make it a strong choice for Columbus-area homeowners looking for a hands-on, community-invested solar installer.
Service Area
Vespa Solar serves the following areas within a 93-mile radius:
Contact Information
Are you Vespa Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Partner Manufacturers
Warranty Coverage
30 years
30 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
5
10 reviews
Amy C.
Vespa Solar made the entire process easy from consultation to installation. Scott and his team were professional, thorough, and much more affordable than any other solar company we quoted. Excellent quality work.
Dave L.
Great customer service and quality work from start to finish. The team explained everything clearly and the installation was completed on time. Very happy with our decision to go with a local company.
Christine R.
Vespa Solar was responsive, knowledgeable, and delivered exactly what they promised. The 30-year warranty on panels and inverters gave us extra peace of mind. Highly recommend for anyone in the Columbus area.
Frequently Asked Questions About Vespa Solar
What services does Vespa Solar offer?
Vespa Solar offers Solar Installation, Battery Storage, Solar Design, Roof Assessment, Monitoring.
Is Vespa Solar NABCEP certified?
Vespa Solar holds the following certifications: None listed. Contact them directly for the latest accreditation details.
What areas does Vespa Solar serve?
Vespa Solar serves Columbus, Upper Arlington, Dublin, Westerville, Hilliard, Grove City, Tallmadge, Akron. They are based in Columbus with a service radius of 150 km.
What warranty does Vespa Solar offer?
Vespa Solar offers 30-year panel warranty, 30-year inverter warranty, and 10-year installation/workmanship warranty.
How are Vespa Solar's customer reviews?
Vespa Solar has a 5/5 rating based on 10 customer reviews. Customers consistently rate them highly.
How long has Vespa Solar been in business?
Vespa Solar was founded in 2021 and has been in business for 5 years. They have solid experience in the solar industry.
Similar Installers in Columbus
Get a Free Solar Quote from Vespa Solar
Fill in your details and we'll connect you with Vespa Solar.
Quote request sent!
Vespa Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile