FP

Florida Power Services

Tampa-based solar power design and construction company with over 18 years of experience

Tampa, Florida
4.7 (80 reviews)
Verified
Residential Commercial

19+

Years in Business

0

80

Customer Reviews

62 mi

Service Area

11-50

Employees

SurgePV Score

8.9 / 10
Customer Reviews
94%
Certifications
90%
Experience
100%
Services Range
90%
Warranty Coverage
63%
Online Presence
75%

About Florida Power Services

Florida Power Services, known as “The Solar Power Company,” is a solar power design and construction firm headquartered at 503 East Jackson Street, Suite 302 in Tampa, Florida. Founded in 2007, the company has established itself as one of Tampa Bay’s experienced solar installers, with local offices also serving St. Petersburg and Largo.

The company holds NABCEP, FSEC, and BPI certifications, placing it among the more credentialed solar contractors in the Tampa Bay region. Florida Power Services handles residential and commercial solar panel installation, repair, and maintenance, using up-to-date equipment and installation methods. The BBB file on the company was opened in May 2010, confirming its long-standing operational history.

Florida Power Services maintains a 4.7-star rating across review platforms, with clients noting service quality that exceeds expectations. The company offers free solar consultations and designs systems tailored to each property’s energy needs, roof orientation, and shading conditions.

Service Area

Florida Power Services serves the following areas within a 62-mile radius:

TampaSt. PetersburgClearwaterLargoBrandon

Are you Florida Power Services?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance
system_design

Certifications & Accreditations

NABCEP FSEC BPI

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.7

80 reviews

Verified Customer

18 August 2025
Verified Customer

Florida Power Services exceeded our expectations with their solar installation. Professional crew, clean work, and the system is performing perfectly.

Verified Customer

25 June 2025
Verified Customer

Joe and his team are true experts. They designed a system that maximizes our roof space and the energy output has been outstanding.

Verified Customer

12 April 2025
Verified Customer

Quality installation at a fair price. The team handled all the permitting and inspections which made the process stress-free.

Frequently Asked Questions About Florida Power Services

What services does Florida Power Services offer?

Florida Power Services offers Solar Installation, Battery Storage, Maintenance, system_design.

Is Florida Power Services NABCEP certified?

Yes, Florida Power Services is NABCEP certified and also holds FSEC, BPI certifications. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does Florida Power Services serve?

Florida Power Services serves Tampa, St. Petersburg, Clearwater, Largo, Brandon. They are based in Tampa with a service radius of 100 km.

What warranty does Florida Power Services offer?

Florida Power Services offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Florida Power Services's customer reviews?

Florida Power Services has a 4.7/5 rating based on 80 customer reviews. Customers consistently rate them highly.

How long has Florida Power Services been in business?

Florida Power Services was founded in 2007 and has been in business for 19 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Florida Power Services

Fill in your details and we'll connect you with Florida Power Services.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote