FP

Freedom Power

Austin's largest residential solar installer, rebranded as Freedom Power in 2026, with over 2,000 five-star reviews and 25-year lifetime warranty

Austin, Texas
4.8 (2000 reviews)
Verified
Residential Commercial

19+

Years in Business

0

2,000

Customer Reviews

99 mi

Service Area

201-500

Employees

SurgePV Score

9.4 / 10
Customer Reviews
96%
Certifications
100%
Experience
100%
Services Range
100%
Warranty Coverage
100%
Online Presence
50%

About Freedom Power

Freedom Power (formerly Freedom Solar Power, rebranded in January 2026) is one of the largest and most established solar installation companies in Texas. Founded in 2007 by Bret Biggart in Austin, the company has grown from a small local installer into a statewide operation with offices in Austin, Houston, San Antonio, and Dallas-Fort Worth. Freedom Power handles every aspect of the solar process in-house, including sales, financing, engineering, permitting, installation, and post-installation monitoring and service.

The company installs panels from Maxeon, Mission Solar, and Qcells alongside Tesla Powerwall and Enphase IQ battery storage systems. Freedom Power is a NABCEP-certified installer, a Tesla Certified installer, and a Maxeon Certified Installer. The company is BBB-accredited with an A+ rating and has accumulated over 2,000 five-star reviews across platforms. Freedom Power offers a 25-year lifetime warranty covering performance, product, and workmanship, guaranteeing panels maintain at least 92% of original energy output.

Freedom Power also provides free site analysis, engineering and design services, financing assistance, rebate application support, and ongoing maintenance. The company services both residential and commercial customers and can repair and upgrade solar systems regardless of the original installer.

Service Area

Freedom Power serves the following areas within a 99-mile radius:

AustinHoustonSan AntonioDallasFort WorthRound RockCedar ParkGeorgetownPflugervilleKyle

Are you Freedom Power?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance
Monitoring
Solar Design
Energy Audit
Roof Assessment
Grid Connection

Certifications & Accreditations

NABCEP BBB Accredited Tesla Certified Maxeon Certified Installer

Partner Manufacturers

Panels

MaxeonMission SolarQcells

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallEnphase IQ Battery

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

25 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.8

2000 reviews

Michael T.

12 August 2025
Verified Customer

Freedom Solar handled everything from design to permitting to installation. The crew was professional and finished ahead of schedule. Our electricity bill dropped by over 80% in the first full month.

Sarah K.

20 June 2025
Verified Customer

We compared four different solar companies in Austin and Freedom Solar offered the best combination of price, equipment quality, and warranty. The Maxeon panels look great on our roof and are producing more than the estimate.

David R.

3 April 2025
Verified Customer

Good experience overall. The sales process was smooth and informative. Installation took two days for our 10 kW system. Only minor issue was a short delay with the city permit, but Freedom kept us updated throughout.

Frequently Asked Questions About Freedom Power

What services does Freedom Power offer?

Freedom Power offers Solar Installation, Battery Storage, Maintenance, Monitoring, Solar Design, Energy Audit, Roof Assessment, Grid Connection.

Is Freedom Power NABCEP certified?

Yes, Freedom Power is NABCEP certified and also holds BBB Accredited, Tesla Certified, Maxeon Certified Installer certifications. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does Freedom Power serve?

Freedom Power serves Austin, Houston, San Antonio, Dallas, Fort Worth, Round Rock, Cedar Park, Georgetown and 2 other areas. They are based in Austin with a service radius of 160 km.

What warranty does Freedom Power offer?

Freedom Power offers 25-year panel warranty, 25-year inverter warranty, and 25-year installation/workmanship warranty.

How are Freedom Power's customer reviews?

Freedom Power has a 4.8/5 rating based on 2000 customer reviews. Customers consistently rate them highly.

How long has Freedom Power been in business?

Freedom Power was founded in 2007 and has been in business for 19 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Freedom Power

Fill in your details and we'll connect you with Freedom Power.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote