Freedom Solar Power
Texas-founded solar installer since 2007 with NABCEP-certified teams and a Grapevine DFW office
19+
Years in Business
33
Customer Reviews
62 mi
Service Area
201-500
Employees
SurgePV Score
About Freedom Solar Power
Freedom Solar Power is a Texas-founded solar installation company established in 2007 by Adrian Buck. The Dallas-Fort Worth office is located at 4055 Corporate Dr, Suite 200, Grapevine, TX 76051, with corporate headquarters in Austin and additional offices in Houston and San Antonio. The company is one of the largest residential solar installers in Texas.
Freedom Solar’s installation teams are NABCEP-certified and the company is a premier Tesla Powerwall certified installer. They install panels from Maxeon, Mission Solar, and Qcells, paired with Enphase inverters and battery storage from Tesla and Enphase. The company holds BBB accreditation with an A rating since 2011 and serves both residential and commercial customers across the DFW metroplex.
The Dallas-Fort Worth location holds a 4.5-star rating from 33 reviews on Yelp. Customers cite the professional installation teams and quality equipment, with the company’s nearly two decades of Texas solar experience providing confidence in long-term system support.
Service Area
Freedom Solar Power serves the following areas within a 62-mile radius:
Contact Information
Are you Freedom Solar Power?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.5
33 reviews
Verified Customer
Freedom Solar's DFW team delivered an excellent installation. The NABCEP-certified crew was thorough and professional. Very happy with the Qcells panels and Enphase system.
Verified Customer
Good overall experience with Freedom Solar in the Dallas area. Quality installation and reliable equipment. Permitting took a few weeks but the team managed it well.
Verified Customer
Chose Freedom Solar for their long track record in Texas. The Tesla Powerwall integration was seamless and has already proven its worth during a recent power outage.
Frequently Asked Questions About Freedom Solar Power
What services does Freedom Solar Power offer?
Freedom Solar Power offers Solar Installation, Battery Storage.
Is Freedom Solar Power NABCEP certified?
Yes, Freedom Solar Power is NABCEP certified and also holds Tesla Powerwall Certified, BBB A Rating certifications. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does Freedom Solar Power serve?
Freedom Solar Power serves Dallas, Fort Worth, Grapevine, Plano, Frisco, Arlington, McKinney. They are based in Dallas with a service radius of 100 km.
What warranty does Freedom Solar Power offer?
Freedom Solar Power offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Freedom Solar Power's customer reviews?
Freedom Solar Power has a 4.5/5 rating based on 33 customer reviews. Customers consistently rate them highly.
How long has Freedom Solar Power been in business?
Freedom Solar Power was founded in 2007 and has been in business for 19 years. They are one of the more experienced solar installers in their area.
Similar Installers in Dallas
Get a Free Solar Quote from Freedom Solar Power
Fill in your details and we'll connect you with Freedom Solar Power.
Quote request sent!
Freedom Solar Power will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile